100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten
logo-home
AOM4801 ASSIGNMENT NO.3 YEAR 2023 SOLUTIONS €9,61
In winkelwagen

Tentamen (uitwerkingen)

AOM4801 ASSIGNMENT NO.3 YEAR 2023 SOLUTIONS

2 beoordelingen
 21 keer verkocht
  • Vak
  • Instelling

AOM4801 ASSIGNMENT NO.3 YEAR 2023 SOLUTIONS

Voorbeeld 3 van de 20  pagina's

  • 2 augustus 2023
  • 20
  • 2023/2024
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden

2  beoordelingen

review-writer-avatar

Door: thapeloderick • 1 jaar geleden

Copy and paste from tutorial letter, no thorough expanding on the theory nor giving any practical work. At best this solution is just setting us up for failure. Please check before uploading. Thank you.

review-writer-avatar

Door: mkobedi • 1 jaar geleden

avatar-seller
AOM4801 ASSIGNMENT 3
YEAR 2023
Advanced Operations Management

, TABLE OF CONTENTS

3.1. CAPACITY MANAGEMENT ........................................................................................................ 4
3.1.1. Should “Capacity can be viewed in two ways, as the maximum rate of output per unit of
time, or as units of resource availability”. With reference to capacity as viewed in a movie-
theatre and a hospital, demonstrate your understanding of the above statement. .......................... 4
3.1.2. Refer to case study 2: With reference to capacity expansion strategies, which type of
capacity expansion strategy should Eskom follow in order to solve their capacity-related
problem. Justify your chosen strategy in context of Eskom, by means of an analysis of that
strategy’s risks and benefits. .................................................................................................................... 5
3.1.3. “In Refer to case study 2: Eskom needs to focus on both short- and long-term capacity
planning. With reference to these two different types of capacity planning, differentiate between
the types of decisions that would typically be made by an organisation such as Eskom, in terms
of electricity generation and/or electricity distribution. .......................................................................... 6
3.2. PROCESS ANALYSIS AND RESOURCE UTILIZATION ...................................................... 8
3.2.1. What is the implied service rate at a bank teller window, if customer demand is 26
customers per hour, two bank tellers are on duty, and their labour utilisation is 90%? .................. 8
3.3. MANAGING INVENTORIES IN SUPPLY CHAINS .................................................................. 9
3.3.1. With reference to the above statement, and the new Luxwheels L-Model L-Model
production plant, discuss the typical challenges you believe operations managers might face
with regard to managing inventories. ...................................................................................................... 9
3.3.2. Differentiate between independent, dependent, static and dynamic demand. Provide
examples of typical stock items to illustrate your answer. ................................................................... 9
3.3.3. Refer to case study 1: The Luxwheels production line at Rosslyn, Pretoria involves the
fitment of numerous different parts, all of which need to be ordered from different suppliers. For
example, the production of each vehicle requires five tyres per vehicle. Differentiate between a
fixed-quantity system and a fixed-period system and, in context of ordering tyres in Luxwheels’
lean focused production plant, analyse which system you think would be more appropriate. ..... 11
3.4. SUPPLY CHAIN MANAGEMENT AND LOGISTICS ............................................................ 12
3.4.1. Order amplification occurs when each member of a supply chain “orders up” to buffer
its own inventory. Name this phenomenon and, using valid motivations, discuss whether you
think Luxwheels L-Model will be influenced by such a phenomenon. ............................................. 12
3.4.2. “Supply chain managers typically balance customer requirements as well as internal
supply chain efficiencies”. With the aid of one internal supply chain metric and one external (i.e.
customer related) supply chain metric, justify this statement. ........................................................... 13
3.4.3. Motivate for the application of manufactured goods recovery and reverse logistics in
making a supply chain more sustainable. ............................................................................................ 14
3.5. RESOURCE MANAGEMENT .................................................................................................... 15

, 3.5.1. In “Aggregate planning and disaggregation in manufacturing organisations differ
substantially from aggregate planning and disaggregation in service organisations”. Do you
agree with this statement? Justify your answer................................................................................... 15
3.5.2. Provide an argument for adopting a chase strategy in context of a major airline call-
centre. 16
3.5.3. Refer to case study 1: Assume Luxwheels (Pty) Ltd have received an MRP schedule
detailing the Gross requirements and Scheduled receipts of “Steering Wheels” for the
Luxwheels L-Model, over the next 7 weeks. The applicable Rule, Lot size, Lead time and
Beginning on-hand inventory are provided below: .............................................................................. 17
3.6. OPERATIONS SCHEDULING AND SEQUENCING ............................................................. 18
3.6.1. Assume that you are a production supervisor tasked with the sequencing of a particular
operation. The operations manager has asked you to explore the trade-offs of using the SPT
and EDD rules, respectively. Discuss these trade-offs with reference to the advantages and
disadvantages of the two rules. ............................................................................................................. 18
3.6.2. Define the concepts of scheduling and sequencing. How do they differ and how are
they similar? .............................................................................................................................................. 19
3.6.3. A custom furniture manufacturer has five jobs waiting for processing as follows: ......... 19
3. References ........................................................................................................................................ 20

Dit zijn jouw voordelen als je samenvattingen koopt bij Stuvia:

Bewezen kwaliteit door reviews

Bewezen kwaliteit door reviews

Studenten hebben al meer dan 850.000 samenvattingen beoordeeld. Zo weet jij zeker dat je de beste keuze maakt!

In een paar klikken geregeld

In een paar klikken geregeld

Geen gedoe — betaal gewoon eenmalig met iDeal, creditcard of je Stuvia-tegoed en je bent klaar. Geen abonnement nodig.

Direct to-the-point

Direct to-the-point

Studenten maken samenvattingen voor studenten. Dat betekent: actuele inhoud waar jij écht wat aan hebt. Geen overbodige details!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper dariuscotley. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €9,61. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 68175 samenvattingen verkocht

Opgericht in 2010, al 15 jaar dé plek om samenvattingen te kopen

Begin nu gratis
€9,61  21x  verkocht
  • (2)
In winkelwagen
Toegevoegd