NERC Prep - Bal, Int, & Trans Exam Questions and Answers Graded A+
22 keer bekeken 1 keer verkocht
Vak
NERC
Instelling
NERC
NERC Prep - Bal, Int, & Trans Exam Questions and Answers Graded A+. What group can approve a change in the
Disturbance Recovery Period for an Interconnection?
a. NERC Interconnection Working Group
b. NERC Operating Committee
c. NERC Regional Council
d. NERC Disturbance Analysis Working Group
...
b. NERC Operating Committee - What group can approve a change in the Disturbance Recovery Period for an Interconnection? a. NERC Interconnection Working Group b. NERC Operating Committee c. NERC Regional Council d. NERC Disturbance Analysis Working Group c. Check targets and equipment - What is the first thing an operator should do after a relay operation? a. Check power system stabilizers b. Notify adjacent Transmission and Balancing areas c. Check targets and equipment d. Notify their PSE that the transmission path is out of service c. Tie Lines - For the ACE equation to work properly, dynamic schedules, pseudo ties, frequency calculations, and all ________ must be metered. a. Communications b. Transformers c. Tie Lines d. Generation c. Energy Emergency Alert Level I - What Energy Alert Level would the following example be categorized as? "A Balancing Authority, Reserve Sharing Group, or Load Serving Entity foresees, or is experiencing conditions where all available resources are committed to meet firm load, firm transactions, etc, and requests an Energy Emergency Alert." NERC Prep - Bal, Int, & Trans Exam Questions and Answers 2023-2024 Graded A+ a. Energy Emergency Alert Level IV b. Energy Emergency Alert Level III c. Energy Emergency Alert Level I d. Energy Emergency Alert Level II b. Implement the appropriate congestion management procedure. - You are a Reliability Coordinator in the Eastern Interconnection. A flow gate has become overloaded because a parallel 345kV line has relayed out and part of that load has transferred over to the flow gate causing an SOL and possible IROL violation. What would you do to relieve this violation? a. Notify another Reliability Coordinator and ask them if they are having any problem, and what should you do. b. Implement the appropriate congestion management procedure. c. Issue a Transmission warning to the Transmission Operators that lost the 345kV line. d. Place the line back in service within 30 minutes. b. Adjacent Balancing Authorities - Interchange schedules may be implemented between _______________________. a. Source and Sink Balancing Authorities b. Adjacent Balancing Authorities c. Sending, Receiving and Intermediate Balancing Authorities in the same Region. d. Balancing Authorities in the same Interconnection. a. Frequency will continue to drop, generator governor response, decrease in load. - When the frequency of an Interconnection decreases due to the loss of a large generator, the ________________ until the combination of both ____________ and ______________ replace the output of the lost generator. a. Frequency will continue to drop, generator governor response, decrease in load b. Frequency will continue to drop, generator governor response, voltage regulating transformer response c. Voltage will continue to raise, generator AVR response, voltage regulating transformer response d. Voltage will continue to raise, generator AVR response, decrease in load a. That all involved reliability entities determined that there is no reliability problems with the Arranged Interchange. - In developing and setting up an Arranged Interchange, which of the following would transition the Arranged Interchange to the Confirmed Interchange status? a. That all involved reliability entities determined that there is no reliability problems with the Arranged Interchange. b. The Department of Energy (DOE) made an in-depth study of the Interchange Agreement and determined that it would have an adverse affect on the Interconnection. c. There are available resources to meet the load. d. All parties involved realized that they would not lose money for their company with this Interchange Agreement. b. He violated NERC standards - Early in the afternoon, a system operator notices that frequency has dropped to 59.95Hz and his balancing area's ACE is 0. In order to correct the under frequency condition, the operator pulses his generators to increase generation. Which statement best describes his actions? a. He followed NERC guidelines b. He violated NERC standards c. He helped the system d. He has not impacted the system
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper STUDYLAB2023. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €15,05. Je zit daarna nergens aan vast.