Tentamen (uitwerkingen)
NCIDQ IDPX Prep Exam
- Vak
- Instelling
Why does the HVAC system need to be balanced at the end of a commercial project? A. To verify that air quality levels are within the design specifications B. To detect significant air leaks in ductwork C. To adjust air flow at each device location to meet the criteria in the engineer...
[Meer zien]