Tentamen (uitwerkingen)
IDPX Final exam 2023 with 100% correct answers
- Vak
- Instelling
Which of the following is NOT true about the Design-Bid-Build project delivery method? generally produces the lowest cost takes longer than other delivery methods the contractor may point out problems, make suggestion or propose changes in the design or specification to reduce the cost of ...
[Meer zien]