100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
ICC Masonry Exam All Possible Questions and Answers with complete solution €7,12   In winkelwagen

Tentamen (uitwerkingen)

ICC Masonry Exam All Possible Questions and Answers with complete solution

 89 keer bekeken  1 keer verkocht
  • Vak
  • ICC Masonry
  • Instelling
  • ICC Masonry

Which of the following is the standard specification for loadbearing concrete masonry units? - ASTM C 90; RCMCI 6th Edition, Section 2.2.1 Which of the following grout admixtures is used to obtain a high slump with reduced water? - Super plasticizer; RCMCI 6th Edition, Section 2.11.6 Which of t...

[Meer zien]

Voorbeeld 2 van de 9  pagina's

  • 20 januari 2024
  • 9
  • 2023/2024
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • ICC Masonry
  • ICC Masonry
avatar-seller
ICC Masonry Exam Which of the following is the standard specification for loadbearing concrete masonry units? - ✔✔ ASTM C 90; RCMCI 6th Edition, Section 2.2.1 Which of the following grout admixtures is used to obtai n a high slump with reduced water? - ✔✔ Super plasticizer; RCMCI 6th Edition, Section 2.11.6 Which of the following is the standard specification that autoclaved aerated concrete masonry units must conform to for the strength class specified in the contra ct documents? - ✔✔ ASTM C 1386; CI 530; Part 2, Section 2.3E. IBC 2103.3 Grout intended for use in the construction of engineered and empirically designed masonry structures must comply with - ✔✔ ASTM C 476; 2006 IBC 2103.12 The slump test for grout must be performed in accordance with - ✔✔ ASTM C 1019; ASTM - C1019 -03 In what condition are grout specimens to be tested? - ✔✔ Damp; ASTM - 1019 -03 When the prism test method is being utilized, how long must the prisms cure prior to being cut? - ✔✔ 28; 2006 I BC 2105.3.1 After construction and grouting, masonry test prisms should not be disturbed or moved for a minimum of - ✔✔ 48 hours; ASTM - C 1314, Section 5.10 When field sampling grout, the elapsed time between obtaining the first and final portions of the sample shall not be more than - ✔✔ 15 minutes; ASTM - C1019, Section 7.2.1 If mortar compression tests are required, how many tests per day are to be taken f or the three successive work days at the start of the job? - ✔✔ 1; RCMCI 6th Edition, 3.2.4 Glass unit masonry shall not be laid at temperatures below - ✔✔ 60 degrees F; 2006 IBC 2104.3.2.1 What is the maximum mean daily temperature permitted before newly constructed masonry must be fog sprayed during curing? - ✔✔ 100 degrees F; 2006 IBC 2104.4.3 When the temperature is below 40 degrees F, newly constructed masonry must be covered with a weather resistant membrane for a minimum of - ✔✔ 24 hours; 2006 IBC 2 104.3.3.3 After initial mixing, when the ambient temperature exceeds 90 degrees F with a wind velocity over 8 mph, mortar used in masonry construction must be discarded after - ✔✔ 2 hours; 2006 IBC 2104.4.2.1 Which type of unit masonry is required to be placed with head and bed joints solidly filled? - ✔✔ Glass; 2006 IBC 2104.1.2.4 Thin bed mortar joints used in laying autoclaved aerated concrete masonry units shall not exceed a thickness of - ✔✔ 1/16"; 2006 IBC 2104.1.2.6 When the ambient temperature e xceeds 100 degrees F or exceeds 90 degrees F with a wind velocity over 8 mph, what is the maximum distance that mortar may be spread ahead of AAC masonry units? - ✔✔ 4'; RCMCI 6th Edition, Section 11.2.4, 2006 IBC 2104.4.2.1(5). What is the maximum spaci ng for weep holes placed in the outside wythe of masonry walls? - ✔✔ 33" on center; 2006 IBC 2104.1.8

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper PatrickKaylian. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €7,12. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 75632 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€7,12  1x  verkocht
  • (0)
  Kopen