When are steel chain slings recommended? Answer- When rigging from three points
A big control valve is pulled who is responsible for the rigging? Answer- Crane operator and rigger
What should be used to hold the pipe when setting up two 40-foot joints of 16-inch STD WT pipe? Answer- 4 legged roller top jacks
The hitch made by wrapping the sling around the load, then passing one eye of the sling throughout a shackle is called? Answer- Choker Hitch
When should rigging material be attached to a bean that is being demolished? Answer- Before any bolts are removed or any cutting is done on the beam.
Which of the following has a greater possibility of being a respiratory hazard? Answer- Asbestos
Which type of insulation is required before a vessel is entered? Answer- Locking, Tagging, and Blinding lines that feed the vessel
According to OSHA, oxygen and acetylene cylinders in storage must be separated at
what minimum distance? Answer- 20 Ft
What is the first thing a boilermaker should do before cutting into a tank or vessel? Answer- Determine the content
What tool is normally used to check the alignment on the horizontal seams of the shell plates? Answer- A 2-foot level
What is used to expand tubes inside mud and steam drums? Answer- Rolling motors and espanders
What does a grooved nut on an Acetylene rig indicate? Answer- The left hand thread is for acetylene use only Thermal beveling of pipe in preparation for welding requires use of an? Answer- Oxyfuel Torch
A 1-inch plate is to be cut. Why should an acetylene gerulator on a cutting rig not be adjusted over 15 PSI? Answer- Acetylene is unstable above this pressure
What action should be taken if a boiler tube fails? Answer- Replace the failed tube
Before a wall burner is pulled for inspection Answer- The fuel gas valve must be shut
Which of the following is a type of insulation used inside furnaces? Answer- Fire Brick
What does "MTW" mean in reference to boiler tubing? Answer- Minimum Wall Thickness
On a drawing, what is used to record any changes to the drawing? Answer- Revision Block
Scales on a drawing are usually written in Answer- inches and feet
Dimensional measurements can be found on all of the following except Answer- Mechanical flow diagram
All vessels elevations are taken from the Answer- top of steel on the embed ring (base plate)
A gate valve is being removed from a product line. All of the following procedures must be performed except? Answer- Valve must be in closed position
What is a spud wrench most commonly used for? Answer- Aligning flanges
What type of valves are typically used on a sight glass to direct flow? Answer- 3 way
valves
Handhole cap and plug material is verified by the Answer- P4 report
What are the four major components of a gate valve? Answer- Body, Bonnet, gate, and stem
What is the most commonly used fasteners in boiler construction? Answer- Threaded
On site, who determines what grade of material to be used for repair? Answer- QA/QC
What is the best tool to be used to prepare XXH 2-inch tubing for welding? Answer- Milling Motor
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper EvaTee. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €13,67. Je zit daarna nergens aan vast.