Tentamen (uitwerkingen)
ACI Concrete Strength Testing Technician CP-19 (14) , With Complete Solution 2024/2025.
- Vak
- Instelling
ACI Concrete Strength Testing Technician CP-19 (14) , With Complete Solution 2024/2025. These procedures for capping enable concrete cylinders and cores to meet the standard's requirements for ________ and _________. Planeness, perpendicularity Equipment needed for the capping process includes...
[Meer zien]