Tentamen (uitwerkingen)
Surveying Final questions well answered 2024
- Vak
- Instelling
Surveying FinalThe conformity of a measurement to the "true" Value. - correct answer Accuracy post construction survey that confirms design execution and records in-progress revisions - correct answer as-built (final) survey a surveyor's level in which line of sight is maintained automaticall...
[Meer zien]