100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
INF3708 Assignment 1 2024 solution €6,65   In winkelwagen

Overig

INF3708 Assignment 1 2024 solution

 64 keer bekeken  3 keer verkocht
  • Vak
  • Instelling
  • Boek

INF3708 Assignment 1 2024 solution

Voorbeeld 4 van de 46  pagina's

  • 6 april 2024
  • 46
  • 2023/2024
  • Overig
  • Onbekend
avatar-seller
UNISA  2024  INF3708-24-Y  This is INF3708!  Assessment 1

QUIZ




Started on Wednesday, 3 April 2024, 7:18 PM
State Finished
Completed on Saturday, 6 April 2024, 6:42 PM
Time taken 2 days 23 hours
Marks 167.00/183.00
Grade 91.26 out of 100.00


Question 1
Correct

Mark 1.00 out of 1.00




Which approach for constructing a WBS uses a similar project’s WBS as a starting point?


a. mind-mapping
b. bottom-up
c. top-down
d. analogy 




Question 2
Correct

Mark 1.00 out of 1.00




The table that lists requirements, their various attributes, and the status of the requirements to ensure that all are addressed
is referred to as _______.


a. Gantt chart
b. requirements traceability matrix 
c. state transition table
d. entity-attribute-value model




Question 3
Correct

Mark 1.00 out of 1.00




Which project management knowledge area ensures that the project will satisfy the stated or implied needs for which it was
undertaken?


a. Project time management
b. Project risk management
c. Project quality management 
d. Project cost management

,Question 4

Correct

Mark 1.00 out of 1.00




The organization recognizes that a new project exists and completes a project charter during which processes for a new
project?


a. opening
b. initiating 
c. planning
d. controlling




Question 5
Correct

Mark 1.00 out of 1.00




In project schedule management, what is the next step after defining project activities?


a. planning schedule management
b. controlling the schedule
c. determining their dependencies 
d. estimating activity duration




Question 6
Correct

Mark 1.00 out of 1.00




What document used to coordinate all project planning documents and help guide a project’s execution and control?


a. project management plan 
b. statement of work
c. scope statement
d. business case




Question 7
Correct

Mark 1.00 out of 1.00




Which statement best describes scope?


a. work involved in creating the products and the processes used to create them 
b. each level of work that is outlined in a work breakdown structure
c. end product created as part of a project that is delivered to the client
d. tasks that are decomposed into smaller tasks in a work breakdown structure

,Question 8

Correct

Mark 1.00 out of 1.00




According to Thamhain and Wilemon, what is the ability to improve a worker’s position?


a. penalty
b. promotion 
c. assignment
d. expertise




Question 9
Correct

Mark 1.00 out of 1.00




What are the bottom four needs in Maslow’s structure are referred to as?


a. self-actualization
b. deficiency 
c. safety
d. growth




Question 10
Correct

Mark 1.00 out of 1.00




Which software development approach allows developers to use a model to generate functional requirement and physical
design specifications concurrently?


a. Prototyping approach 
b. incremental approach
c. RAD approach
d. Waterfall approach




Question 11
Correct

Mark 1.00 out of 1.00




The main outputs of which process are team performance assessments, change requests, and updates to several
documents?


a. managing the project team
b. acquiring the project team
c. human resource planning
d. developing the project team 

, Question 12

Correct

Mark 1.00 out of 1.00




Which technique is used for making cost and schedule trade-offs to obtain the greatest amount of schedule compression for
the least incremental cost?


a. crashing 
b. dependency
c. feeding buffers
d. breakdown structure




Question 13
Correct

Mark 1.00 out of 1.00




You work for a project team which decides not to us an upcoming release of software because it might cause your schedule
to slip. Which risk response strategy are you using?


a. acceptance
b. transference
c. avoidance 
d. mitigation




Question 14
Correct

Mark 1.00 out of 1.00




Which process involves prioritizing risks based on their probability and impact of occurrence?


a. planning risk responses
b. identifying risks
c. performing quantitative risk analysis
d. performing qualitative risk analysis 




Question 15

Correct

Mark 1.00 out of 1.00




Business case are developed at which software project management activity of?


a. Project design
b. Feasibility study 
c. Project execution
d. Planning

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper foxNotes. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €6,65. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 64438 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€6,65  3x  verkocht
  • (0)
  Kopen