The purpose of Construction Quality Management is to: - Correct Answer Achieve the quality established by properly developed requirements through the combined responsibility, but seperate efforts of contractpr smd government personnel.
Construction ...
construction quality management is the performance
partnering relationships are based upon
it is the responsibility of quality assurance pers
Geschreven voor
CQM-C
CQM-C
Verkoper
Volgen
Winfred
Ontvangen beoordelingen
Voorbeeld van de inhoud
CQM-C EXAM QUESTIONS AND CORRECT
ANSWERS 2024
The purpose of Construction Quality Management is to: - Correct Answer Achieve the quality established by properly developed requirements through the combined responsibility, but seperate efforts of contractpr smd government personnel.
Construction Quality Management is the performance of tasks, which ensure that construction is performed. - Correct Answer According to plans and specifications, on time, within a defined budget and a safe work environment.
Partnering relationships are based upon: - Correct Answer Building trust and dedication to common goals
It is the responsibility of Quality Assurance Personnel to: - Correct Answer Periodically verify that the contractors system of control is working effectively.
An effective contractor quality control program will: - Correct Answer Be an incentive for work to be done correctly the first time resulting in earlier completion, reduced field overhead costs, and greater profits.
The success or failure of all contractors is based upon: - Correct Answer The ability to control costs, finance work, estimate jobs, schedule the work, and maintain effective quality control.
Quality Assurance Personnel have the responsibility to: - Correct Answer Require contractors to maintain the quality specified in the plans and specifications.
Inspection is: - Correct Answer The process by which ongoing and completed work is examined
During the punch-out inspection of a project: - Correct Answer Quality Assurance Personnel must assure that the contractor prepares a punch-list and makes corrections.
If there is a disagreement whether the contractors work complies with the contract: - Correct Answer
The government makes the final determination
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper Winfred. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €8,36. Je zit daarna nergens aan vast.