Tentamen (uitwerkingen)
ARE 5.0 – PPD Exam with Complete Solutions 100% Solved
- Vak
- Instelling
ARE 5.0 – PPD Exam with Complete Solutions 100% Solved SITE DESIGN: BLDG LOCATION/IMPROVEMENTS - ALL BLDGS DISRUPT DRAINAGE. ACCOMMADATE INCREASED RUNOFF. POSITIVE DRAINAGE AWAY FROM BLDGS. SITE DESIGN: DRAINAGE TYPES - ABOVE GROUND OR BELOW GROUND. ABOVE: PERVIOUS PAVING, SHEET FLOW, ...
[Meer zien]