TEST BANK For Information Technology Project Management 9th Edition by Kathy Schwalbe, Verified Chapters 1 - 13, Complete Newest Version
74 keer bekeken 3 keer verkocht
Vak
Information Technology Project Management, 9e
Instelling
Information Technology Project Management, 9e
Boek
Information Technology Project Management
TEST BANK For Information Technology Project Management 9th Edition by Kathy Schwalbe, Verified Chapters 1 - 13, Complete Newest Version TEST BANK For Information Technology Project Management 9th Edition by Kathy Schwalbe, Verified Chapters 1 - 13, Complete Newest Version TEST BANK For Information...
information technology project management 9th edit
Gekoppeld boek
Titel boek:
Auteur(s):
Uitgave:
ISBN:
Druk:
Meer samenvattingen voor studieboek
COMPLETE TEST BANK: Information Technology Project Management 9th Edition by Kathy Schwalbe Latest Update.
TEST BANK For Information Technology Project Management 9th Edition by Kathy Schwalbe,
TEST BANK For Information Technology Project Management 9th Edition by Kathy Schwalbe, Verified Chapters 1 - 13, Complete Newest Version
Alles voor dit studieboek
(50)
Geschreven voor
Information Technology Project Management, 9e
Information Technology Project Management, 9e
Verkoper
Volgen
LECTARTHUR
Ontvangen beoordelingen
Voorbeeld van de inhoud
Page 1 of 820 TEST BANK For Information Technology Project Management 9th Edition Kathy Schwalbe, Verified Chapters Page 2 of 820 True / False 1. Until the 1980s, project management primarily focused on providing schedule and resource data to top management in the military, computer, and construction industries. a. True b. False ANSWER: True RATIONALE: Feedback: Until the 1980s, project management primarily focused on providing schedule and resource data to top management in the military, computer, and construction industries. Today’s project management involves much more, and people in every industry and every country manage projects. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.2 LEARNING OBJECTIVES: INFO.SCHW.14.1 - LO: 1-1 NATIONAL STANDARDS: United States - BUSPROG: Technology TOPICS: Introduction KEYWORDS: Bloom's: Knowledge 2. A difference between operations and projects is that operations end when their objectives have been reached, whereas projects do not. a. True b. False ANSWER: False RATIONALE: Feedback: Projects are different from operations in that they end when their objectives have been reached or the project has been terminated. POINTS: 1 DIFFICULTY: Difficulty: Moderate REFERENCES: p.4 LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2 NATIONAL STANDARDS: United States - BUSPROG: Analytic TOPICS: What is a Project? KEYWORDS: Bloom's: Comprehension 3. Every project should have a well-defined objective. a. True 2 Page 3 of 820 4. Projects should be developed in increments. a. True b. False ANSWER: True RATIONALE: Feedback: A project is developed using progressive elaboration. Projects are often defined broadly when they begin, and as time passes, the specific details of the project become clearer. Therefore, projects should be developed in increments. POINTS: 1 DIFFICULTY: Difficulty: Moderate REFERENCES: p.6 LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2 NATIONAL STANDARDS: United States - BUSPROG: Analytic TOPICS: What is a Project? KEYWORDS: Bloom's: Comprehension 5. Resources in a project should be used effectively because they are limited. a. True b. False ANSWER: True RATIONALE: Feedback: A project requires resources, often from various areas. Resources, however, are limited and must be used effectively to meet project and other corporate goals. POINTS: 1 DIFFICULTY: Difficulty: Moderate REFERENCES: p. 7 LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2 NATIONAL STANDARDS: United States - BUSPROG: Analytic b. False ANSWER: True RATIONALE: Feedback: A project has a unique purpose. Every project should have a well-defined objective. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.6 LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2 NATIONAL STANDARDS: United States - BUSPROG: Analytic TOPICS: What is a Project? KEYWORDS: Bloom's: Knowledge 2 Page 4 of 820 TOPICS: What is a Project? KEYWORDS: Bloom's: Comprehension
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper LECTARTHUR. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €15,47. Je zit daarna nergens aan vast.