Tentamen (uitwerkingen)
CAPM PMBOK Glossary Exam Study Questions and Answers Graded A
- Vak
- Instelling
Work Package - The work defined at the lowest level of the work breakdown structure for which cost and duration can be estimated and managed. Acceptance Criteria - A set of conditions that is required to be met before deliverables are accepted. Accuracy - Within the quality management system,...
[Meer zien]