CDT Exam Prep | 100% Correct Answers
| Verified | Latest 2024 Version
Which of these documents, might we find in the Project Manual but they are not contract documents?
A. The Agreement
B. Procurement Requirements
C. Addendum
D. Supplemental Conditions - B
Before a model building code can be...
CDT Exam Prep | 100% Correct Answers
| Verified | Latest 2024 Version
Which of these documents, might we find in the Project Manual but they are not contract documents?
A. The Agreement
B. Procurement Requirements
C. Addendum
D. Supplemental Conditions - ✔✔B
Before a model building code can become the building code for a jurisdiction, it has to be adopted by?
A. Authority Having Jurisdiction
B. State Government
C. Building Inspector
D. International Organization for Standardization - ✔✔A
The Construction Manager is hired by this entity?
A. General Contractor
B. Owner
C. A/E
D. Contract Administrator - ✔✔B
The parties to the Construction Agreement are?
A. General Contractor, Subcontractor, and Construction Manager
B. A/E, General Contractor, and Contract Administrator
C. Building Official and General Contractor
D. Owner, Contractor, and A/E - ✔✔D
The organization responsible for the General Conditions known as 201 are?
,A. DBIA
B. AGC
C. AIA
D. CSI - ✔✔C
When there is a dispute between the specifications and the drawings, what is the proper way to settle
the dispute?
A. The drawings have priority
B. The A/E should interpret
C. The specifications
D. Arbitration - ✔✔B
A subcontractor is obligated to the prime contractor in the same manner as the prime contractor is
obligated to the:
A. Architect
B. Owner
C. Material Supplier
D. Principal in Charge - ✔✔B
The requirements of the General Conditions can be modified or expanded to accommodate specific
project conditions, owner's requirements, or unusual aspects relating to the roles, rights, duties, and
responsibilities of the parties to the contract for construction, in this document:
A. Contract Modifications
B. Supplemental Conditions
C. Addendum
D. Consensus Documents - ✔✔B
Which of the following are not legal binding construction documents?
A. General Conditions
B. Specifications
, C. Preliminary Project Description
D. Addendum - ✔✔C
This document states that the Contractor shall review, approve, and submit to the Architect, shop
drawings, product data, samples, and similar submittals required by the contract documents. It also
states that the Architect will review and approve or take other appropriate action upon the Contractor's
submittals:
A. Construction Agreement
B. Field Order
C. General Requirements
D. AIA A201 - ✔✔D
Division 01 sections apply broadly to the execution of the work of all the other sections of the
specifications. In addition, they expand on certain administrative and procedural provisions of the:
A. Drawings
B. Construction Agreement
C. Conditions of the Contract
D. Procurement Documents - ✔✔C
Defined as the written and graphic documents prepared or assembled by the A/E for communicating the
project design for construction and administering the construction contract:
A. Construction Documents
B. Plans
C. Procurement Documents
D. Conditions of the Contract - ✔✔A
Typically, Procurement Requirements should not include which of the following documents?
A. Instructions for Procurement
B. Available Information, including Resource Drawings
C. Procurement Forms and Supplements
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper hov. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €7,96. Je zit daarna nergens aan vast.