100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten
logo-home
TEST FROM BIGSWPPP Questions & answers €11,29
In winkelwagen

Tentamen (uitwerkingen)

TEST FROM BIGSWPPP Questions & answers

 0 keer verkocht
  • Vak
  • Instelling

TEST FROM BIGSWPPP Questions & answers

Voorbeeld 3 van de 17  pagina's

  • 4 juli 2024
  • 17
  • 2023/2024
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
avatar-seller
TEST FROM BIGSWPPP

Motives for staying in compliance with stormwater objectives include:

A. Staying out of trouble with the law
B. Appeasing environmental groups
C. Making your boss happy
D. None of these answers - ANS-A

NPDES stands for:

A. National Pollution Division of Environmental Science
B. Non Pollution Discharge Elimination Standards
C. National Pollution Development Erosion Standards
D. National Pollutant Discharge Elimination System - ANS-D

The law that set into place stormwater regulations in the 1970's is...

A. The Federal Pollution Discharge Elimination Rules
B. The Stormwater Pollution Control Act
C. The Clean Water Act
D. The National Water Control Act - ANS-C

Regulations for managing Stormwater Activity on a construction site are outlined in
the...
A. NOI
B. NOT
C. NPDES
D. DOT - ANS-C

When should you read and understand your project Stormwater Pollution Prevention
Plan (SWPPP)?

A. After the project Owner calls you to their office
B. After an Agency inspector visits the job site
C. Immediately after project award and before you begin any site work
D. During project closeout - ANS-C

,Which of the following is a not an allowable stormwater discharge or non-stormwater
discharge

A. Discharge from dewatering activities
B. Discharge from borrow areas
C. Discharge from staging areas
D. Discharge of contaminated groundwater - ANS-D

Construction activity may begin

A. When the jurisdiction of operations specifies you can start
B. Immediately after equipment shows up on site
C. Right after a rain event
D. Once you have called the State - ANS-A

Waters that fail anti-degradation standards are placed on the ______ list.

A. 303d
B. none of the above
C. 404a
D. 301d - ANS-A

SWPPP certifications are signed by

A. The project engineer
B. An Officer of the Project Owner or an Officer of the General Contractor
C. Anyone with a pen
D. Any one on the project site - ANS-B

The Notice of Termination can be filed when

A. All construction, inside and outside the building is complete and final stabilization has
been verified as complete
B. At the end of the rainy season
C. Only offsite street work is left.
D. GC believes site meets permit requirements for final stabilization and notes this on a
daily report - ANS-A

Operators on a construction site are the entity in charge of plans and specification and
the entity who ...

, A. ... brings lunch to the site
B. ... is in charge of daily activities
C. ... visits the property weekly
D. ... sends reports to the owner and other interested parties - ANS-B

TRUE/FALSE

The document that must be completed, signed and submitted to the state to obtain
authorization to discharge is the NOT. - ANS-False

TRUE/FALSE

Construction sediment is not considered a potential pollutant source. - ANS-False

TRUE/FALSE

The Notice of Intent (NOI) must be submitted to the appropriate regulatory agency
before the Stormwater Prevention Plan is developed. - ANS-False

TRUE/FALSE

The name of the list of impaired waters is called the Total Maximum Daily Load (TMDL)
List - ANS-False

A well constructed SWPPP for your site should be...

A. Created as soon as it starts raining
B. Copied from a similar site
C. Generic
D. Site specific - ANS-D

The NOI must be submitted...

A. Prior to commencing construction
B. After commencing construction
C. By anyone conducting land disturbing activities
D. Once you bring contaminated materials on site - ANS-A

One necessary component of a good SWPPP is

Dit zijn jouw voordelen als je samenvattingen koopt bij Stuvia:

Bewezen kwaliteit door reviews

Bewezen kwaliteit door reviews

Studenten hebben al meer dan 850.000 samenvattingen beoordeeld. Zo weet jij zeker dat je de beste keuze maakt!

In een paar klikken geregeld

In een paar klikken geregeld

Geen gedoe — betaal gewoon eenmalig met iDeal, creditcard of je Stuvia-tegoed en je bent klaar. Geen abonnement nodig.

Direct to-the-point

Direct to-the-point

Studenten maken samenvattingen voor studenten. Dat betekent: actuele inhoud waar jij écht wat aan hebt. Geen overbodige details!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper EXAMQA. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €11,29. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 69052 samenvattingen verkocht

Opgericht in 2010, al 15 jaar dé plek om samenvattingen te kopen

Begin nu gratis
€11,29
  • (0)
In winkelwagen
Toegevoegd