100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
2024 FLORIDA CONTRACTOR'S MANUAL ACTUAL EXAM V1 250+ QUESTIONS & 100% CORRECT VERIFIED ANSWERS WITH RATIONALES GRADED A+ €25,99   In winkelwagen

Tentamen (uitwerkingen)

2024 FLORIDA CONTRACTOR'S MANUAL ACTUAL EXAM V1 250+ QUESTIONS & 100% CORRECT VERIFIED ANSWERS WITH RATIONALES GRADED A+

 5 keer bekeken  0 keer verkocht
  • Vak
  • Instelling

2024 FLORIDA CONTRACTOR'S MANUAL ACTUAL EXAM V1 250+ QUESTIONS & 100% CORRECT VERIFIED ANSWERS WITH RATIONALES GRADED A+ 2024 FLORIDA CONTRACTOR'S MANUAL ACTUAL EXAM V1 250+ QUESTIONS & 100% CORRECT VERIFIED ANSWERS WITH RATIONALES GRADED A+

Voorbeeld 4 van de 182  pagina's

  • 27 juli 2024
  • 182
  • 2023/2024
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
avatar-seller
2024 FLORIDA CONTRACTOR'S MANUAL ACTUAL
EXAM V1 250+ QUESTIONS & 100% CORRECT
VERIFIED ANSWERS WITH RATIONALES GRADED
A+

Which of the following is NOT a cause for the Owner to terminate the Contract?


1- The Contractor experiences delays due to a Stop Work order through an act of government
2- The Contractor fails to make payment to Subcontractors for labor
3- The Contractor is guilty of substantial breach of a provision of the Contract Documents
4- The Contractor repeatedly fails to supply enough properly skilled workers - ANSWER---
A201: 14.2.1
Article 14) Termination or Suspension of the Contract
14.2 Termination by the Owner for Cause


1- The Contractor experiences delays due to a Stop Work order through an act of government


Which of the following is owner of all drawings and specifications?


1- Contractor
2- Owner
3- Architect
4- Supplier - ANSWER---A201: 1.5.1
Article 1) General Provisions
1.5 Ownership and Use of Drawings, Specifications and Other Instruments of Servic


3- Architect
A Subcontractor's employee incorrectly performs the Work. Who is responsible (to the Owner)
for the error?

, 2024 FLORIDA CONTRACTOR'S MANUAL ACTUAL
EXAM V1 250+ QUESTIONS & 100% CORRECT
VERIFIED ANSWERS WITH RATIONALES GRADED
A+

1- Subcontractor employee
2- Architect
3- Subcontractor
4- Contractor - ANSWER---A201: 3.3.2
Article 3) Contractor
3.3 Supervision and Construction Procedures




4- Contractor


Except for those Claims excluded by this AIA A201 Section 15,2,1, an initial decision shall be
required as a condition precedent to mediation of any Claim arising prior to the date final
payment is due, unless 30 days have passed after the Claim has been referred to the Initial
Decision Maker with no decision having been rendered.


1- 10
2- 20
3- 15
4- 30 - ANSWER---A201: 15.2.1
Article 15) Claims and Disputes
15.2 Initial Decision

, 2024 FLORIDA CONTRACTOR'S MANUAL ACTUAL
EXAM V1 250+ QUESTIONS & 100% CORRECT
VERIFIED ANSWERS WITH RATIONALES GRADED
A+




4- 30


The ____________ will on request furnish to a ____________ information regarding
percentages of completion or amounts applied for by the Contractor


1- Subcontractor; Owner
2- Architect; Subcontractor
3- Owner; Subcontractor
4- Owner; Architect - ANSWER---A201: 9.6.3
Article 9) Payments and Completiong
9.6 Progress Payments




2- Architect; Subcontractor


To whom is the Subcontractor bound to by the Contract Documents?


1- Architect

, 2024 FLORIDA CONTRACTOR'S MANUAL ACTUAL
EXAM V1 250+ QUESTIONS & 100% CORRECT
VERIFIED ANSWERS WITH RATIONALES GRADED
A+
2- Owner
3- Themselves
4- Contractor - ANSWER---A201: 5.3
Article 5) Subcontractors
5.3 Subcontractual Relations




4- Contractor


The Initial Decision Maker will review claims within 10 days of the receipt of the Claim take
one or more of the following actions. Which of the following actions will NOT be taken?


1- Approve the Claim
2- Request additional supporting data from the Claimant
3- Reject the Claim
4- Ignore the request - ANSWER---A201: 15.2.2
Article 15) Claims and Disputes
15.2 Initial Decision

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper erickarimi. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €25,99. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 72042 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen

Laatst bekeken door jou


€25,99
  • (0)
  Kopen