"Projected available balance" is a term referring to unsold finished goods inventory - ️️False 100% inspection is justified when the cost of inspection is low - ️️False A BOM file is also called - ️️Product Tree A BOM file is also called which of the following - ️️Product Tree A...

[Meer zien]

Voorbeeld 2 van de 5  pagina's

  • 2 augustus 2024
  • 5
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • OPMA 3306
  • OPMA 3306
avatar-seller
82 Final Exam Review OPMA 3306
Questions
"Projected available balance" is a term referring to unsold finished goods inventory - ✔ ✔ False

100% inspection is justified when the cost of inspection is low - ✔ ✔ False

A BOM file is also called - ✔ ✔ Product Tree

A BOM file is also called which of the following - ✔ ✔ Product Tree

A free trade zone operates under different rules and laws than a foreign trade zone - ✔ ✔ False

A lot for lot (L4L) lost sizing technique does not take into account setup costs or capacity limitations - ✔
✔ True

A master production schedule is an input to a material requirements planning (MRP) system - ✔ ✔
True

A matrix project structure is often referred to as a "skuckworks" - ✔ ✔ False

A modular bill of materials in the term for an item that can be produced and stocked as a subassembly -
✔ ✔ True

A modular bill of materials includes items with fractional options - ✔ ✔ False

A opportunity flow diagram is used to separate the value added from the non value added steps in a
process - ✔ ✔ True

A product tree can do which of the following - ✔ ✔ help to compute component usage

A project can be subdivided into which of the following - ✔ ✔ work packages

A project milestone is a specific event to be reached by a particular point of time - ✔ ✔ True

A quality guru named Joseph M Juran defined quality as fitness for use - ✔ ✔ True

A quality guru named Philip Crosby defined quality as fitness for use - ✔ ✔ False

A quality guru named Phillip Crosby defined quality as conformance to requirements - ✔ ✔ True

An analytical tool used in six-sigma quality improvement programs is which of the following - ✔ ✔
checksheets

, An event unit package is a subdivision of a project - ✔ ✔ False

An example of assignable variation in a production system may be that workers are not identically
trained - ✔ ✔ True

An input to the material requirements planning (MRP) system is an exception report - ✔ ✔ False

An input to the material requirements planning (MRP) system is an inventory records file - ✔ ✔ True

An operational goal of total quality management is the careful design of the product or service - ✔ ✔
True

An opportunity flow diagram as part of a six sigma quality improvement process might be found in
which DMAIC category - ✔ ✔ Improve

An output of MRP is a bill of materials (BOM) file - ✔ ✔ False

AQL stands for accepting questionable lots in production quality management - ✔ ✔ False

Breakthrough projects are those that provide fundamental improvements to existing products - ✔ ✔
False

Conformance quality is a strategic decision for a firm - ✔ ✔ False

Design of Experiments (DOE) is sometimes referred to as multivariate testing - ✔ ✔ True

Design of Experiments (DOE) refers to the work done before production of early model prototypes of a
new product - ✔ ✔ False

Design quality in products refers to the degree to which a products or service specifications are met - ✔
✔ False

Design quality refers to the inherent value of the product in the marketplace - ✔ ✔ True

Facility location analysis considers the competitive imperative to be close to customers as to timeliness
of deliveries - ✔ ✔ True

Failure mode and effect analysis is used in six sigma projects. It involves which of the following - ✔ ✔
calculating a risk priority number for each possible failure

For which of the following should we use a "p" chart to monitor process quality - ✔ ✔ Defective
electrical switches

Freezing the master schedule is - ✔ ✔ done to avoid the chaos of expediting and resultant overdue
orders

Generally, determining lost sizes in MRP systems is simple - ✔ ✔ False

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper jackline98. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €7,46. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 79789 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€7,46
  • (0)
  Kopen