DBIA Exam Latest(2024/2025) Updated Questions and Answers with complete solutions.
6 keer bekeken 0 keer verkocht
Vak
DBIA
Instelling
DBIA
Provides baseline budgets and schedules and list estimate trends - Trend logs
Fastest Project Delivery method, fast tracking possible overlapping design with construction utilizing
incremental packages. - Design Build
Bill directing A/E's selected on qualifications, what year? - Brooks Bill 1972...
DBIA Exam
Provides baseline budgets and schedules and list estimate trends - Trend logs
Fastest Project Delivery method, fast tracking possible overlapping design with construction utilizing
incremental packages. - Design Build
Bill directing A/E's selected on qualifications, what year? - Brooks Bill 1972
Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing
Design-Build. - Clinger Cohen Act/Defense Procurement Reform Act 1996
The level of quality that any average Design Professional would be able to perform given the
circumstances. - Standard of Care
Slowest Project Delivery method, linear in nature, prescriptive (owner knows what they want), -
Design Bid Build
Project Delivery - Many contracts through Owner - Multi Prime
Project Delivery method allowing the contractor to come on board very early in design for
preconstruction services yet maintains separation between Designer and Builder contractually. -
CM at Risk
Procurement Method - Most Familiar - Low Bid
Procurement Method - Common for A/E - Negotiated (Qualifications Based)
Procurement Method - Qualifications and Price - Best Value
, Procurement Method - Direct - Sole Source
Contract Format w/ agreed upon fixed price - Lump Sum
Contract Format - contractor reimbursed for actual cost plus an agreed upon percentage - Cost
Plus Fee
Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for actual cost plus a fee only
up to a certain amount. - GMP (Guaranteed Maximum Price)
Contract Format - cost per piece - Unit Price
Federal Government passed bond requiring payment and performance bonds on all public works, what
year? - Miller Act 1935
Contract Format - established cost/benchmark determined jointly by project team. - Target Price
Singular responsibility for both design & construction was first codified by ____ - Hammurabi
Owner provided items such as 20% design or more and provides prescriptive specs at RFP. -
Bridging Documents
Owner is responsible for implied warranties in the sufficiency of the specifications. - Spearin
Doctrine
____ ____ should identify end results. - Performance Requirements
Single point of responsibility for both design & construction is an attribute of what delivery method? -
Design Build
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper ACADEMICMATERIALS. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €7,80. Je zit daarna nergens aan vast.