100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
DBIA Test Questions And Answers With 100% Correct Answers €7,85   In winkelwagen

Tentamen (uitwerkingen)

DBIA Test Questions And Answers With 100% Correct Answers

 5 keer bekeken  0 keer verkocht
  • Vak
  • DBIA
  • Instelling
  • DBIA

a subjective measure for evaluating a project that is hard to measure; this is determined through the design process, not after the project is completed - design value describes in terms of exactly how the product and/or its components must be built; cookbook approach; developed by the design bu...

[Meer zien]

Voorbeeld 2 van de 13  pagina's

  • 3 augustus 2024
  • 13
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • DBIA
  • DBIA
avatar-seller
DBIA Test
a subjective measure for evaluating a project that is hard to measure; this is determined through the
design process, not after the project is completed - design value



describes in terms of exactly how the product and/or its components must be built; cookbook approach;
developed by the design builder but used by owners in the RFP/bridging documents for operability or
maintenance needs and conditions of permits or third parties; examples: uniformat C10, partitions.
"Install gypsum wallboard on 3-5/8" metal studs at 16" on center with XX acoustical insulation per YY
standards." - prescriptive requirement




how team members are paid (fp, gmp, cost reimbursement, target price, unit price) - contracting
approach



linear, sequential process, A/E selected on qualifications, GC selected on low price, design is fully
completed without input from GC, A/E acting in owner's interests, with a historically strong bond,
process is well-established and understood - Design-Bid-Build (DBB)



similar org structure to DBB, construction manager selected by QBS or best value, contractor provides
precon services, negotiated gmp contracting approach, open book estimating process, potential to fast
track project, construction cost determined before design completed, potential issues over what is
reasonably inferable from gmp design documents - construction manager at risk



The owner contracts with one entity (a person or firm) to provide both design and construction services,
designer and contractor have a direct contractual relationship, selected by QBS or best value, wide
spectrum of contracting approaches and organizational structures, single point responsibility, owner
does not manage designer, owner exposure to claims is significantly reduced - Design-Build

how team members are selected (QBS, best value, low price, sole source) - Procurement Method



similar to design build, in industrial and power generation sectors, systems and performance testing are
central to scope, contractor will typically perform engineering with its in-house staff, owner has need for
single point responsibility, contracts include plant and process performance guarantees, contract items

, include performance and schedule liquidated damages and limitations of liability - engineer
procure construct (epc)



owner contracts with multiple trade contractors, attributes are typically similar to dbb, owner's ability to
schedule and coordinate the work - Multiple Prime Contracting



multi-party agreement - all parties equal, QBS procurement and target pricing contract approach, private
sector use (limited at this time), key: owner's ability to accept risk - Integrated Project Delivery
(IPD)



Instead of government building and maintaining major infrastructure (such as highway, water treatment
plant), build and maintenance is outsourced to a private company. Opposed by public sector unions. this
is not considered a delivery system but its underlying approaches are delivery systems and typically use
DB. multiple procurement and contracting approaches - public-private partnership (p3)



intense efforts to establish scope early in the process; drives early team formation to include key trade
subcontractors; can enable big decisions to be made early, affect project outcomes at lowest cost,
establish a need for co-location and collaboration, and compress time during concurrent design and
construction - shift left



typically two-phase best value procurement with lump sum contract; owner defines project
requirements and scope of prescriptive work; use of performance-based technical requirements with
limited prescriptive specifications - traditional design build



design and price are progressively developed after the design-builder is under contract; final project cost
and schedule commitment is not established as part of the selection process; two phases: preliminary
services and final design and construction services - progressive design build



describe the end result - criteria documents



prescribes how to achieve the end result - bridging documents

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper ACADEMICMATERIALS. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €7,85. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 66579 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€7,85
  • (0)
  Kopen