1. Risks
Answer: The effect of uncertainty on objectives
The chance of something happening that will have an impact on objectives
Being prepared for the worst and being poised to exploit o...
[Meer zien]
Laatste update van het document: 2 maanden geleden
, RIMS CRMP Implementing the Risk Process
1. Risks
Answer: The effect of uncertainty on objectives
The chance of something happening that will have an impact on objectives
Being prepared for the worst and being poised to exploit opportunities as they arediscovered
2. Risk management strategies' general focus
Answer:
Meeting or exceeding an organization's objectives
Adhering to control-based objectives, rules and/or controls
Complying with regulatory requirements
3. Communication and Consultation
Answer: Risk management professional's role inImplementing Risk Strategies
4. Risk Identification Process
Answer: Finding, Recognizing and Recording Risks
5. Risk Analysis
Answer: The process of characterizing and understanding the nature of risk and of considering
the level of risk in the context of the organization's willingnessto accept risk.
6. Likelihood, Consequences, other criteria such as timing, duration, vulnerability and
interdependencies: Risk is typically analyzed on the basis of
7. Bow tie analysis
Answer: hazard analysis technique (cause and consequence)
8. Business impact analysis
Answer: consider business impacts at a location or from aspecific process
9. Gap analysis
Answer: determine steps to improve the organization's capacity to movefrom a current state to
a desired, future state. (current available factors, successfactors needed to achieve future
desired objectives, highlighting the gaps)
10. Root Cause Analysis
Answer: multiple techniques designed to identify the underlyingor initiating risk sources or
drivers. (fault tree analysis, event tree analysis, failure mode and effect analysis and cause-
and-effect analysis - fish bone diagram)
11. Influence analysis/diagrams
Answer: identify the strength of influencing factors andhelp determine potential weighting for
consideration during the risk assessment process. Define root causes for major risks, define
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper ExamNavigator. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €9,53. Je zit daarna nergens aan vast.