______________ refers to the monitoring required to follow empirical process control, to ensure that the project deliverables conforms to the requirements. - correct answer Inspection ______________ demonstrates the reasons for undertaking a project...

[Meer zien]

Voorbeeld 3 van de 18  pagina's

  • 8 augustus 2024
  • 18
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • CSM.
  • CSM.
avatar-seller
Scrum Study for CSM

______________ refers to the monitoring required to follow empirical process control, to ensure that
the project deliverables conforms to the requirements. - correct answer
Inspection



______________ demonstrates the reasons for undertaking a project. It answers the question "Why is
this project needed?" ______________________ drives all decision making related to a project. - correct
answer Business Justification



Name the Scrum Processes (5) - correct answer Initiate, Plan & Estimate,
Implement, Review & Retrospect, Release.



Name the Scrum Aspects (5) - correct answer Organization, Risk, Business
Justification, Quality and Change



Name the Scrum Principles (6) - correct answer Emperical Process Control,
Value Based Prioritization, Iterative Development, Collaboration,

Time-Boxing, Self-Organization



Individuals and interactions over process and tools

Working software over comprehensive documentation

Customer collaboration over contract negotiation

Responding to change over following a plan - correct answer Agile Manifesto



Initiate Phase - correct answer 1. Create Project Vision.

2. Identify Scrum Master and Stakeholder(s).

3. Form Scrum Team.

4. Develop Epic(s).

5. Create Prioritized Product Backlog.

,6. Conduct Release Planning.



Plan and Estimate Phase - correct answer 1. Create User Stories

2. Approve, Estimate, and Commit User Stories

3. Create Tasks

4. Estimate Tasks

5. Create Sprint Backlog



Implement Phase - correct answer 1. Create Deliverables

2.Conduct Daily Stand-ups

3. Groom Priortized Product Backlog



Review and Retrospect Phase - correct answer 1. Convene Scrum of Scrums

2. Demonstrate and Validate Sprint.

3. Retrospect Sprint.



Release Phase - correct answer 1. Ship Deliverables

2. Retrospect Project



___________ happens as the Scrum Core Team and Stakeholder(s) learn through transparency and
inspection and then adapt by making improvements in the work they do. - correct answer
Adaptation



__________________________________ is a Scrum approach in which the team learns from experience
and stakeholder engagement to keep the Prioritized Product Backlog updated with changes in
requirements. - correct answer Continuous Improvement



_________ refers to the Scrum Core Team working together and interfacing with the stakeholders to
create and validate the deliverables of the project to meet the goals outlined in the Project Vision. -
correct answer Collaboration

, The ______________ is an individual or the organization that acquires the project's product, service, or
other result. For any organization, depending on the project, there can be both internal customers (i.e.,
within the same organization) or external customers (i.e., outside of the organization). - correct answer
Customer



An ___________ model helps make decisions based on observation and experimentation rather than on
detailed upfront planning. It relies on the three main ideas of transparency, inspection, and adaptation. -
correct answer Emperical Process Control



_________ is the phased delivery of value to the customer. - correct answer
Iterative delivery



Scrum believes that employees are self-motivated and seek to accept greater responsibility. Hence, they
deliver much greater value when __________. - correct answer self-organized



___________ can be defined as determining the order of things and separating what will be done now,
from what can be done later. - correct answer Prioritization



_______ refers to setting short periods of time for work to be done. If the work undertaken remains
incomplete at the end of the ______, it is moved into a subsequent ______. ________ provide the
structure needed for Scrum projects, which have an element of uncertainty and are prone to frequent
changes. - correct answer Time-boxing



__________________ is the pace at which the team can work and comfortably maintain. It translates to
increased employee satisfaction, stability, and increased estimation accuracy, all of which ultimately
leads to increased customer satisfaction. - correct answer Sustainable Pace



_________ allows all facets of any Scrum process to be observed by anyone. Sharing all information
leads to a high trust environment. - correct answer Transparency



Collaboration is an extremely important element in Scrum and the __________________________
outlines how the various decision makers, stakeholders and team members engage and collaborate with
each other. - correct answer Collaboration Plan

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper RealGrades. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €13,66. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 79202 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€13,66
  • (0)
  Kopen