100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
CDT Exam Elaborations With Accurate Solutions €20,65   In winkelwagen

Tentamen (uitwerkingen)

CDT Exam Elaborations With Accurate Solutions

 1 keer bekeken  0 keer verkocht
  • Vak
  • CDT*
  • Instelling
  • CDT*

CDT Exam Elaborations With Accurate Solutions

Voorbeeld 4 van de 36  pagina's

  • 11 augustus 2024
  • 36
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • CDT*
  • CDT*
avatar-seller
CDT Exam Elaborations With Accurate Solutions

Which of these documents, might we find in the
Project Manual but they are not contract documents?

(A) The Agreement
(B) Procurement Documents
(C) Addendum
(D) Supplemental Conditions ✔️- Answer: B

Reference: PDPG 11.1.6

Explanation: Procurement requirements are
addressed to prospective bidders or proposers
interested in the project. Although not necessarily
part of a contract, the procurement requirements are
usually bound with other written construction
documents into a project manual.

Before a model building code can become the
building code for a jurisdiction, it has to be adopted
by?

(A) Authority Having Jurisdiction
(B) State Government
(C) Building Inspector
(D) International Organization for
Standardization ✔️- Answer: A

Reference: PDPG 4.3

Explanation: Before a model building code can
become the building code for a jurisdiction, it has to
be adopted by that AHJ. Once adopted, they then
are responsible for enforcing that building code
within their jurisdiction.

,The Construction Manager is hired by this entity?

(A) The General contractor
(B) Owner
(C) A/E
(D) Contract Administrator ✔️- Answer: B

Reference: PDPG 2.6.4

Explanation: The owner usually engages the
services of a construction manager, an entity that
typically contracts with the owner to provide
construction management services.

The parties to the Construction Agreement are?

(A) General Contractor, Sub Contractor, and
Construction Manager
(B) A/E, General Contractor, and Contract
Administrator
(C) Building Official, and General contractor
(D) Owner, Contractor, and A/E ✔️- Answer: D

Reference: PDPG 7.2.3.1

Explanation: (PDPG Figure 5.1) The tripartite relationship among the owner,
contractor,
and A/E is created by obligations to third parties to the contract. For example,
the
owner-A/E agreement may require certain duties of the A/E acting on behalf
of the owner
during construction. The contractor has a right to rely on the proper
performance of these
duties. The A/E, similarly, relies on the contractor to perform certain duties
identified in
the owner-contractor agreement, even though the A/E is not a party to that
contract. The
A/E relationship to the contractor in the owner-contractor agreement is a
third-party

,relationship. These third-party relationships create the third side of the
triangle in the
construction process.(PDPG 7.2.3.1) The owner contracts first with the A/E to
design the
project and to prepare bidding documents. The owner then obtains bids
through the
competitive bidding process from bidding contractors. When one of he
bidders is selected
by the owner, the owner will either directly enter into the contract (such as
for a project to
be constructed with public funds), or negotiate the final cost and then enter
into the
contract (such as for a privately funded project).

The organization responsible for the General
Conditions known as 201 are?

(A) DBIA
(B) AGC
(C) AIA
(D) CSI ✔️- Answer: C

Reference: PDPG 11.5.4.2

Explanation: Each document deals with project
conditions and issues in a similar manner but with
language determined to be in accord with the needs
of each organization.

When there is a dispute between the specifications
and the drawings, what is the proper way to settle
the dispute?

(A) The drawings have priority
(B) The A/E should interpret
(C) The specifications
(D) Arbitration ✔️- Answer: B

Reference: PDPG 11.2.9.4, 13.9.1.1, AIA A201 1.2.1

, Explanation: The drawings and specification are complementary documents
in
the AIA and EJCDC general conditions. (PDPG 11.2.9.4) Precedence: Questions
of precedence often arise among large scale drawings, small-scale drawings,
and
specifications. However, the use of statements in the project manual to
establish
the precedence of the various contract documents is not recommended
because
the documents are complementary. The general conditions of the contract
should
indicate only that in a case of conflict between drawings and specifications,
the
A/E will make a documented interpretation. (PDPG 13.9.1.1) When the
contract
documents are being interpreted, the contents of the drawings and the
specifications must be considered together. If an item is not addressed in both
the
drawings and the specifications, it does not mean that it is not required for the
project. (AIA A201 1.2.1) The Contract Documents are complementary, and
what
is required by one shall be as binding as if required by all

A subcontractor is obligated to the prime contractor
in the same manner as the prime contractor is
obligated to the:

(A) Architect
(B) Owner
(C) Material Supplier
(D) Principal in Charge ✔️- Answer: B

Reference: PDPG 2.4.2 , 2.5

Explanation: A subcontractor generally provides labor at the site. A material
supplier furnishes the materials for others to install. (PDPG
2.4.2)Subcontractor: An entity that has a direct contract with the contractor to
perform a portion of the work of the project at the site. (PDPG 2.5)

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper Studyhall. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €20,65. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 79064 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€20,65
  • (0)
  Kopen