NCIDQ IDPX Study Exam Questions & Answers 2024/2025
Which of the following puts more responsibility on the designer, can be used to explore unique design solutions and the use of new technology, are used to set criteria rather than requirements, and must be coordinated with the AHJ for final a...
NCIDQ IDPX Study Exam Questions &
Answers 2024/2025
Which of the following puts more responsibility on the designer, can be used to explore unique design
solutions and the use of new technology, are used to set criteria rather than requirements, and must be
coordinated with the AHJ for final approval?
What is the drawing for the 54th floor electrical plan?
54E3.1
E3.1-54
3.1E-54
none of the above - ANSWERS54E3.1
After defining the exact scope of work and selecting individual floor finish types for each area of your
project, you must provide your client with an updated working budget number.
Which method of estimating would be used at this time?
Local Cost Indicies
Square Footage Method
Parameter Method
Matrix Costing - ANSWERSParameter Method
, You are working with a client on a quick retrofit that requires furniture to be ordered, delivered and
installed within a quick 4-week time period.
Which form during the ordering process with the furniture dealer/manufacturer/vendor should you give
careful attention in order to verify the timeline will not be disrupted?
Freight Bill
Acknowledgement
Purchase Order
Sales Agreement - ANSWERSAcknowledgement
During construction, changes in the construction work are made by all of the following means except?
change order
change directive
minor change in work
addenda - ANSWERSaddenda
All of the following steps are part of the project close out except?
respond to owner's questions and problems during period immediately after move in process
verify issuance of certificate of occupancy
final application and certificate for payment
verify owner has received all lien waivers - ANSWERSverify issuance of certificate of occupancy
As outlined in the General Conditions of the Contract for Construction, who pays for any field
tests/inspections beyond what is required in the contract documents?
Owner
General Contractor
Interior Designer
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper Bensuda. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €9,22. Je zit daarna nergens aan vast.