If manufacturer training is no longer available, may a local agency help?
Approve similar alternate training.
UST includes?
,Tank and attached piping.
What constitutes a UST?
A petroleum storage tank.
What UST system is suitable for secondary containment?
Double-walled tanks
According to title 23, the following plumbing components, if installed after July 1,
1987, require supplementary containment.
Pressured product piping.
Tanks constructed after July 1, 2003, are considered "pipe".
Product piping under pressure, as well as vapour recovery underground.
Under dispenser containment (UDC) was necessary for all existing UST systems.
December 31, 2003.
A system for exchanging gas vapors in a storage tank with product in a gasoline
delivery vehicle
Stage 1 Vapor Recovery
An approved approach for non-visual monitoring of existing UST systems.
Statistical Inventory Reconciliation (SIR).
,ATG must be able to detect the emission of?
0.2 gallons per hour.
What is no longer an acceptable way for non-visual monitoring of existing UST
systems?
Manual inventory reconciliation.
Automatic line leak detectors installed on subterranean plumbing with secondary
containment must be capable of detecting leaks of?
3 gallons per hour at 10 psi.
How frequently should ATG be programmed to test the tank?
At least monthly.
According to PEI RP 300, a flammable gas can be used.
Identify vapour leaks in a vapour recovery system.
According to PEI RP 300, what should a written scope of work for vapour recovery
installation include?
Construction blueprints.
When the tank is empty, does the positive shut-off overfill protection device stop
the flow of fuel?
95% full
, According to Executive Order (EO) VR 201-A, what may cause a nozzle shut off
mechanism or malfunction?
Depended filter seal deterioration.
According to VR 201-A, breakaway reconnection should be?
Logged in GDF log.
According to PEI RP 300, what is an incorrect technique of documenting piping
location?
Drawing a diagram on the inside cover of the vapor recovery device manual.
According to PEI RP 300, as-built drawings or photos of subterranean piping and
other components must be_________.
maintained as long as UST is operational.
According to EO VR 101-E, maintenance records must cover what?
Name and Designated UST Operator.
The Phil-Tite EVR Phase 1 system requires that vapor vent pipes in any UST
system be
Used with no more than three p/v valves.
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper luzlinkuz. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €10,34. Je zit daarna nergens aan vast.