COSC 153 EXAM 1 QUESTIONS AND ANSWERS 2024 NEW UPDATE What does the construction manager do asides form the technical skills? - Answer-have the ability to solve problems and make quality decisions What percentage of design/build projects are led by contractors? - Answer-approximately 56% ...

[Meer zien]

Voorbeeld 2 van de 6  pagina's

  • 28 augustus 2024
  • 6
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • COSC 153
  • COSC 153
avatar-seller
COSC 153 EXAM 1 QUESTIONS AND
ANSWERS 2024 NEW UPDATE

What does the construction manager do asides form the technical skills? - Answer-have
the ability to solve problems and make quality decisions

What percentage of design/build projects are led by contractors? - Answer-
approximately 56%

Who selects project delivery? - Answer-the owner

Who is the chief engineer on a project while also reporting to the project manager? -
Answer-project engineer

Who matches daily and weekly activities with the overall schedule, as well as being the
companies representative as the site? - Answer-project superintendent

How is cost determined? - Answer-estimate or budget

Difference between at-risk and agency construction management? - Answer-at risk = 2
contracts (owner & manager, owner & designer)

What is an agreement where the designer and the contractor share in the financial risk
of a project? - Answer-Joint venture

What process is used to determine who gets the contract for public projects? - Answer-
open bid process

For private projects to take place in open bidding they must take what action? - Answer-
send out "invitation for bids" to numerous contractors

When it comes to placing bids, which selection method would work best when price is
the only criteria? - Answer-low-bid selection

What piece of legislation requires that qualifications based selections must be used to
purchase architecture and engineering services and that price negotiations are not a
consideration in the selection processes? - Answer-Brooks Act 1972

Today, bid runners (wait/do not wait) by phones with any last minute bids that may
come in to alter the number lower - Answer-do not wait

, What are some categories which a contractor must include when submitting a bidding
estimate? - Answer-all materials, equipment, labor, subcontracts, overhead, profit
necessary

A document, written by the owner, requesting pricing and a technical solution for design
and/or construction services - Answer-RFP (request for proposal)

The process in which an owner, based upon minimum financial, management, and
other qualitative data, determines whether a construction firm is fundamentally qualified
to compete for a certain project or a class of projects? - Answer-prequalification

Used with private projects and is not open to the public - Answer-closed bid

Public notice providing info regarding bidding procedures for public projects - Answer-
advertisement for bids

In ancient Egypt, architecture, engineering, and construction were all the responsibility
of one person, called? - Answer-master builder

5 sectors of the construction industry? - Answer-residential, commercial, heavy civil,
industrial, & environmental

3 primary players in an construction project? - Answer-owner, designers, & contractors

apartments, condos, & townhomes are referred to as? - Answer-multi-family dwellings

what 2 types of professionals are engaged in the construction process? - Answer-
Architects & engineers

who is the driving force behind the construction industry? - Answer-owners

Rule of 6? - Answer-No more than 6 people communicate with on one project

what is a written contract? - Answer-written on paper

what is a verbal contract? - Answer-an agreement that is spoken

3 categories of residential builders? - Answer-custom, small value, & production
builders

whats an exterior cladding system thats supported entirely by the frame of the building,
rather than being self-supporting or load bearing? - Answer-curtain wall

what is NAMC? - Answer-National Association of Minority Contractors

What was used to teach people certain skills in the middle ages? - Answer-guilds

Dit zijn jouw voordelen als je samenvattingen koopt bij Stuvia:

Bewezen kwaliteit door reviews

Bewezen kwaliteit door reviews

Studenten hebben al meer dan 850.000 samenvattingen beoordeeld. Zo weet jij zeker dat je de beste keuze maakt!

In een paar klikken geregeld

In een paar klikken geregeld

Geen gedoe — betaal gewoon eenmalig met iDeal, creditcard of je Stuvia-tegoed en je bent klaar. Geen abonnement nodig.

Direct to-the-point

Direct to-the-point

Studenten maken samenvattingen voor studenten. Dat betekent: actuele inhoud waar jij écht wat aan hebt. Geen overbodige details!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper Scholarsstudyguide. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €12,39. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 71250 samenvattingen verkocht

Opgericht in 2010, al 15 jaar dé plek om samenvattingen te kopen

Begin nu gratis

Laatst bekeken door jou


€12,39
  • (0)
In winkelwagen
Toegevoegd