To minimize the cost of a software project, quality management techniques should be applied: Select an answer: A. as close to their writing (i.e., point of origination) as possible. B. primarily at project start to ensure that the project is established in accordance with organizational ...

[Meer zien]

Voorbeeld 4 van de 154  pagina's

  • 9 september 2024
  • 154
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • CISA
  • CISA
avatar-seller
1 | P a g e | © copyright 2024/2025 | Grade A+




CISA Questions (301 - 400) Questions
& 100% Correct Answers
To minimize the cost of a software project, quality management techniques

should be applied:




Select an answer:

A.

as close to their writing (i.e., point of origination) as possible.




B.

primarily at project start to ensure that the project is established in accordance

with organizational governance standards.




C.

continuously throughout the project with an emphasis on finding and fixing defects

primarily through testing to maximize the defect detection rate.




D.

mainly at project close-down to capture lessons learned that can be applied to

future projects.




Master01 | September, 2024/2025 | Latest update

, 2 | P a g e | © copyright 2024/2025 | Grade A+


✓ :~~ You are correct, the answer is C.




A. Quality assurance (QA) should start as early as possible but continue through the

entire development process.




B. Only performing QA during the start of the project will not detect problems that

appear later in the development cycle.




C. While it is important to properly establish a software development project,

quality management should be effectively practiced throughout the project. The

major source of unexpected costs on most software projects is rework. The general

rule is that the earlier in the development life cycle that a defect occurs, and the

longer it takes to find and fix that defect, the more effort will be needed to

correct it. A well-written quality management plan is a good start, but it must also

be actively applied. Simply relying on testing to identify defects is a relatively

costly and less effective way of achieving software quality. For example, an error

in requirements discovered in the testing phase can result in scrapping significant

amounts of work.




D. Capturing lessons learned will be too late for the current project. Additionally,

applying quality management techniques throughout a project is likely to yield its

own insights into the causes of quality problems and assist in staff development.




Master01 | September, 2024/2025 | Latest update

, 3 | P a g e | © copyright 2024/2025 | Grade A+


When identifying an earlier project completion time, which is to be obtained by

paying a premium for early completion, the activities that should be selected are

those:




Select an answer:

A.

whose sum of activity time is the shortest.




B.

that have zero slack time.




C.

that give the longest possible completion time.




D.

whose sum of slack time is the shortest.


✓ :~~ You answered D. The correct answer is B.




A. Attention should focus on the tasks within the critical path that have no slack

time.




Master01 | September, 2024/2025 | Latest update

, 4 | P a g e | © copyright 2024/2025 | Grade A+


B. A critical path's activity time is longer than that for any other path through the

network. This path is important because if everything goes as scheduled, its length

gives the shortest possible completion time for the overall project. Activities on

the critical path become candidates for crashing (i.e., for reduction in their time

by payment of a premium for early completion). Activities on the critical path

have zero slack time and conversely, activities with zero slack time are on a

critical path. By successively relaxing activities on a critical path, a curve showing

total project costs versus time can be obtained.




C. The critical path is the longest time length of the activities, but is not based on

the longest time of any individual activity.




D. A task on the critical path has no slack time.




Which of the following should an IS auditor review to understand project progress

in terms of time, budget and deliverables for early detection of possible overruns

and for projecting estimates at completion (EACs)?




Select an answer:

A.

Function point analysis (FPA)




Master01 | September, 2024/2025 | Latest update

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper MASTER01. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €12,63. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 76669 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€12,63
  • (0)
  Kopen