What is the term for the initial phase of a construction project where project goals, scope, and
feasibility are determined?
Preconstruction
What is the purpose of a construction project budget?
To plan, track, and c...
construction management final exam study guide wit
Geschreven voor
Construction Management
Construction Management
Verkoper
Volgen
BrilliantScores
Ontvangen beoordelingen
Voorbeeld van de inhoud
Construction Management Final Exam
Study Guide with Complete Solutions
What is the term for the initial phase of a construction project where project goals, scope, and
feasibility are determined?
✔✔ Preconstruction
What is the purpose of a construction project budget?
✔✔ To plan, track, and control all project expenses and ensure the project stays within financial
limits.
What does a construction manager use to track progress and manage the schedule of a project?
✔✔ Project Schedule
What is the term for the document that specifies the quality standards and requirements for
materials and workmanship in a construction project?
✔✔ Specifications
1
,What is the name of the phase in which the actual construction work begins and continues
through to project completion?
✔✔ Construction Phase
What is the primary role of a project manager in construction?
✔✔ To oversee and coordinate all aspects of the project to ensure it is completed on time, within
budget, and to the required quality standards.
What is the term for the detailed list of tasks and activities required to complete a construction
project, including their durations and dependencies?
✔✔ Work Breakdown Structure (WBS)
What is the importance of conducting a site analysis before starting a construction project?
✔✔ To evaluate site conditions and potential challenges that could impact the project’s design
and execution.
What is the purpose of a contract change order in construction management?
✔✔ To document and authorize any changes to the original scope of work, schedule, or cost.
2
, What is the term for the process of ensuring that construction work complies with building
codes, regulations, and contract requirements?
✔✔ Quality Assurance
What is the role of a construction safety plan?
✔✔ To outline procedures and guidelines to prevent accidents and ensure the safety of workers
on the construction site.
What is the term for the final inspection and approval process to ensure that all work is
completed according to the contract requirements before the project is formally accepted?
✔✔ Project Closeout
What does a construction manager use to communicate and resolve issues among project
stakeholders?
✔✔ Project Meetings
What is the term for the approach used to assess and manage potential risks that could impact the
successful completion of a construction project?
✔✔ Risk Management
3
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper BrilliantScores. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €9,77. Je zit daarna nergens aan vast.