100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten
logo-home
PRM3701 ASSIGNMENT 5 2024 SEMESTER 2 €4,01
In winkelwagen

Overig

PRM3701 ASSIGNMENT 5 2024 SEMESTER 2

 1 keer verkocht
  • Vak
  • Instelling

PRM3701 ASSIGNMENT 5 2024 SEMESTER 2

Voorbeeld 4 van de 72  pagina's

  • 11 september 2024
  • 72
  • 2024/2025
  • Overig
  • Onbekend
avatar-seller
9/10/24, 2:34 PM Assessment 5




PRM3701-24-S2  Welcome Message  Assessment 5

QUIZ




Question 1

Not yet answered

Marked out of 1.00




. In the Snapshot from Practice in your textbook, the results of analyzing the Katrina hurricane resulted in a new evaluation
plan from:


a. The state legislature

b. The governor of Louisiana




c. The city of New Orleans

d. The Red Cross

Clear my choice




Question 2
Not yet answered

Marked out of 1.00




It can be a significant challenge to keep the project team ___________ as the project nears completion.


a. focused

b. working

c. energetic

d. together

e. performing

Clear my choice




https://mymodules.dtls.unisa.ac.za/mod/quiz/attempt.php?attempt=22066345&cmid=941683 1/6

,9/10/24, 2:34 PM Assessment 5

Question 3

Not yet answered

Marked out of 1.00




Because of circumstances beyond the control of the project team, many projects are easy for a review group to close down.
This type of project closure is called


a. normal

b. premature

c. perpetual

d. failed project

e. changed priority

Clear my choice




Question 4
Not yet answered

Marked out of 1.00




Which part of the audit report examines in detail the underlying causes of problems, issues, and successes relative to the
project and includes concise, factual review statements of the project?


a. Classification

b. Analysis

c. Recommendations

d. Lessons learned

e. Appendix

Clear my choice




Question 5
Not yet answered

Marked out of 1.00




This type of closure occurs when the project may never seem to end. At some point the review group should recommend
methods for bringing final closure to this type of project. This is considered ___________ closure.


a. normal

b. premature

c. perpetual

d. changed priority

e. failed project

Clear my choice



https://mymodules.dtls.unisa.ac.za/mod/quiz/attempt.php?attempt=22066345&cmid=941683 2/6

,9/10/24, 2:34 PM Assessment 5

Question 6

Not yet answered

Marked out of 1.00




Research consistently points out that project success is strongly affected by the degree to which a project has the support of
top management. The following are ways a project manager can manage upward relationships EXCEPT


a. never ignore the chains of command.

b. prove loyalty
c. pick the optimum time to appeal to top management.

d. consistently follow through on requests.

e. accept profound differences in perspective and become skilled at the art of persuading superiors.

Clear my choice




Question 7
Not yet answered

Marked out of 1.00




Once you have established who the key players are that will determine success, then you initiate contact and begin to build a
relationship with those players. Less effective managers


a. spend the majority of their time outside their office.

b. are able to stay in touch with what is really going on through face-to-face interactions.

c. announce an open door policy and encourage others to see them when a problem or issue comes up.

d. initiate contact to provide encouragement and to reinforce the objectives and vision of the project.

e. talk with key stakeholders in attempt to keep abreast of developments and anticipate potential problems.

Clear my choice




Question 8
Not yet answered

Marked out of 1.00




The difference between project management and project leadership is that project management includes:


a. Recognizing the need to alter direction

b. Aligning people to meet new directions

c. Monitoring results against plans




d. Motivating people to meet new objectives

Clear my choice




https://mymodules.dtls.unisa.ac.za/mod/quiz/attempt.php?attempt=22066345&cmid=941683 3/6

, 9/10/24, 2:34 PM Assessment 5

Question 9

Not yet answered

Marked out of 1.00




The second ring in the network of relationships for project managers includes all of the following except:




a. Other project managers

b. Customers

c. Functional managers

d. Sponsors

Clear my choice




Question 10
Not yet answered

Marked out of 1.00




Which of the following requires more management rather than leadership?


a. Taking corrective action

b. Changes in project scope

c. Technological stalemates

d. All of these require the same level of management

Clear my choice




Question 11

Not yet answered

Marked out of 1.00




Which dimension of project management centers on creating a temporary social system within a larger organizational
environment that combines the talents of a divergent set of professionals working to complete the project?



Select one:
a. Communication

b. Sociocultural

c. Social

d. Technical

e. Scheduling

Clear my choice



https://mymodules.dtls.unisa.ac.za/mod/quiz/attempt.php?attempt=22066345&cmid=941683 4/6

Dit zijn jouw voordelen als je samenvattingen koopt bij Stuvia:

Bewezen kwaliteit door reviews

Bewezen kwaliteit door reviews

Studenten hebben al meer dan 850.000 samenvattingen beoordeeld. Zo weet jij zeker dat je de beste keuze maakt!

In een paar klikken geregeld

In een paar klikken geregeld

Geen gedoe — betaal gewoon eenmalig met iDeal, creditcard of je Stuvia-tegoed en je bent klaar. Geen abonnement nodig.

Direct to-the-point

Direct to-the-point

Studenten maken samenvattingen voor studenten. Dat betekent: actuele inhoud waar jij écht wat aan hebt. Geen overbodige details!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper tatendamuzavazi. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €4,01. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 69052 samenvattingen verkocht

Opgericht in 2010, al 15 jaar dé plek om samenvattingen te kopen

Begin nu gratis
€4,01  1x  verkocht
  • (0)
In winkelwagen
Toegevoegd