CGM-C UPDATED Actual Exam Questions and CORRECT Answers The purpose of Construction Quality Management is to: - CORRECT ANSWER- Achieve the quality established by properly developed requirements through the combined responsibility, but separate, efforts of contractor and Government personnel...

[Meer zien]

Voorbeeld 2 van de 5  pagina's

  • 14 september 2024
  • 5
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • CGM-C
  • CGM-C
avatar-seller
CGM-C UPDATED Actual Exam Questions
and CORRECT Answers
The purpose of Construction Quality Management is to: - CORRECT ANSWER✔✔-
Achieve the quality established by properly developed requirements through the combined
responsibility, but separate, efforts of contractor and Government personnel


Construction Quality Management is the performance of tasks, which ensure that design and
construction is performed: - CORRECT ANSWER✔✔- According to plans and
specifications, on time, within a defined budget and a safe work environment.


Partnering relationships are based upon: - CORRECT ANSWER✔✔- Building trust and
dedication to common goals


It is the responsibility of Quality Assurance Personnel to: - CORRECT ANSWER✔✔-
Periodically verify that the contractors system of control is working effectively.


An effective contractor quality control (CQC) program will: - CORRECT ANSWER✔✔- Be
an incentive for work to be done correctly the first time resulting in earlier completion,
reduced field overhead costs, and greater profits.


The success or failure of all contractors is based upon: - CORRECT ANSWER✔✔- The
ability to control costs, finance work, estimate jobs, schedule the work, and maintain
effective quality control.


Quality Assurance Personnel have the responsibility to: - CORRECT ANSWER✔✔- Require
contractors to maintain the quality specified in the plans and specifications.


Inspection is: - CORRECT ANSWER✔✔- The process by which ongoing and completed
work is examined


During the punch-out inspection of a project: - CORRECT ANSWER✔✔- Quality
Assurance Personnel must assure that the contractor prepares a punch-list and makes
corrections.

, If there is disagreement whether the contractor's work complies with the contract: -
CORRECT ANSWER✔✔- The government makes the final determination


Characteristics that describe a definable feature of work (DFOW) include: - CORRECT
ANSWER✔✔- Cross-referenced listings to the contractors construction schedule that may
have more than one definable feature under a section of the specifications.


The _____________________ consists of daily checks of the work to assure continuing
compliance with contract requirements. - CORRECT ANSWER✔✔- Follow-up phase



The Quality Assurance Plan: - CORRECT ANSWER✔✔- Is a government management tool
establishing staffing, training, pre-award activities, and surveillance activities.


Testing is extremely important in Construction Quality Management and is performed by: -
CORRECT ANSWER✔✔- Both the contractor and the government


If the contractor does not provide an adequate superintendent, the contract allows the
contracting officer to: - CORRECT ANSWER✔✔- Require the contractor to assume
personal supervision of the work.


The Quality Control Plan: - CORRECT ANSWER✔✔- Is the foundation upon which quality
work is based and outlines planned quality control procedures.


Tests that are unannounced, randomly performed, and repeat quality control tests are: -
CORRECT ANSWER✔✔- Quality Assurance tests


If initial review of the Quality Control Plan shows it to be unacceptable: - CORRECT
ANSWER✔✔- The contractor makes changes before acceptance.



The contractor quality control organization: - CORRECT ANSWER✔✔- May vary in size
depending on the work being performed at a point in time.

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper MGRADES. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €7,38. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 78291 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€7,38
  • (0)
  Kopen