100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
WMGT 101 Question and answers 100% correct 2024/2025 €13,75   In winkelwagen

Tentamen (uitwerkingen)

WMGT 101 Question and answers 100% correct 2024/2025

 6 keer bekeken  0 keer verkocht
  • Vak
  • WMGT
  • Instelling
  • WMGT

WMGT 101 Question and answers 100% correct 2024/2025 WMGT 101- Week 3 Quiz & Exam [STATEMENT OF WORK] How statements of work impact a contractor's performance: - correct answer o A SOW can impact a contractor's performance positively if it provides - Clearly defined requirements - Well co...

[Meer zien]

Voorbeeld 4 van de 35  pagina's

  • 19 september 2024
  • 35
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • WMGT
  • WMGT
avatar-seller
WMGT 101- Week 3 Quiz & Exam
[STATEMENT OF WORK] How statements of work impact a contractor's
performance: - correct answer ✔o A SOW can impact a contractor's
performance positively if it provides
- Clearly defined requirements
- Well communicated expectations
- A basis for an accurate estimate for the level of effort and cost
- A foundation for monitoring quality
o Failure to articulate these subjects can make the contractor fail to represent
what the government/customer wants in their proposal, create
miscommunication and ultimately waste time and resources building
something that the customer does not need.


[STATEMENT OF WORK] Developing a statement of work to meet these
desired requirements will reflect and be organized as so: - correct answer
✔o General
Intro
Background
Scope
Regulations
o Project Administration
Meeting time/places
Conferences
Site visits
o Tasks and Technical Requirements
Heart of the SOW
Breakdown of work required

,Time constraints
o Deliverables
Progress reports expected
Delivery methods
Pay periods
o Deliverable Schedule (Attachment)


[STATEMENT OF WORK] Different work breakdown structures include -
correct answer ✔o CSI Master Format
o 16 trades/50 divisions
o Concrete
o Masonry
o Plumbing
o Materials based
o Very detailed


o UnitFormat2
o 6 major elements
o Substructure
o Shell
o Interiors
o Works based
o Sequencing


[STATEMENT OF WORK] Work breakdown structures can be utilized to
benefit a statement of work: - correct answer ✔by clarifying to the contractor
the work that needs to be done, specifications, quantities, and materials.

,[STATEMENT OF WORK] The government contracting officer uses the
government cost estimate in price analysis: - correct answer ✔in the form of
a Form 9, which includes the independent government estimate and forms the
basis of what fair costs will be when establishing job specifications. It's a
foundation in which the
contracting officer uses to make a contract


[STATEMENT OF WORK] An independent government estimate (IGE) is
important because: - correct answer ✔it gives
o Realistic estimates of all costs
o Funding requirements for the AF Form 9
o Basis of negotiations for fair prices
o Labor/hours
o Gives contractor/engineer frame of reference for negotiating contracts
Form 9 is a purchase request package, which includes the IGE


[STATEMENT OF WORK] Technical Evaluations are important: - correct
answer ✔in the contracting process because they are the basis for evaluating
the contract the contractor came up with, and that they indeed know the job
requirements, and it is what the government/customer asked for.
o Fact-finding
o FAR required
o Basis must seem sound


[PROJECT MANAGEMENT] Define PM - correct answer ✔The process to
systematically accomplish a specific task

, [PROJECT MANAGEMENT] List the steps in PM from cradle-to-grave -
correct answer ✔- Plan and program
- Construction contract
- Contract documents
- Construction
- Project closeout


[PROJECT MANAGEMENT] List the universal project goals of PM - correct
answer ✔- High quality
- On-time
- In-budget
- Safe


[PROJECT MANAGEMENT] ID the key players that make up the PM team -
correct answer ✔- Project manager
- Contracting Officer
- Senior management
- Owner/user
- Design team
- Contractor & subcontractors
- Coordinating agencies


[PROJECT MANAGEMENT] ID key elements of the 5 phase project execution
- correct answer ✔-Plan and program
--Define and validate the requirement
--Consider, evaluate, and select the site location
--Evaluate the impact on the BCAMPS and other plans

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper flyhigher329. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €13,75. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 67096 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€13,75
  • (0)
  Kopen