100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
PRM3701 Assignment 6 (COMPLETE ANSWERS) Semester 2 2024 (705306) - DUE 1 October 2024 €2,47   In winkelwagen

Tentamen (uitwerkingen)

PRM3701 Assignment 6 (COMPLETE ANSWERS) Semester 2 2024 (705306) - DUE 1 October 2024

 9 keer bekeken  0 keer verkocht
  • Vak
  • Instelling
  • Boek

PRM3701 Assignment 6 (COMPLETE ANSWERS) Semester 2 2024 (705306) - DUE 1 October 2024 QUESTION 1 [15 MARKS] You have been invited to deliver a speech to young graduates about important issues in project management. To educate them properly answer the questions that follow. • Please note you wil...

[Meer zien]

Voorbeeld 3 van de 23  pagina's

  • 22 september 2024
  • 23
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
avatar-seller
PRM3701

Assignment 6 (VERIFIED ANSWERS)

Semester 2 2024 (705306) - DUE 1 October

2024

, Course
Project Management (PRM3701)
Institution
University Of South Africa (Unisa)
Book
Project Management
QUESTION 1

1.1 Five Constraints in Project Management

To ensure that a project is completed successfully, it is necessary to carefully
balance several restrictions. Aside from money constraints, project managers
must deal with a number of other constraints that might have an impact on
project development and outcomes. Here are five essential restrictions that
project managers need to balance-

1. SCOPE

, A project's scope describes its particular objectives, outputs, and characteristics.
Scope creep, or the uncontrolled increase of a project's scope without
corresponding changes in time, budget, or resources, can have a negative impact
on project success. Clearly identifying project objectives, establishing
boundaries, and making sure that any changes are officially accepted through a
change management procedure are all part of managing scope. Project managers
must collaborate extensively with stakeholders to maintain an in-depth
understanding of the project's requirements and keep the team focused on the
established deliverables
.

2. TIME

In each activity, time is a vital limitation. A project's success is frequently judged
by its ability to meet deadlines and finish tasks on time. Delays in one aspect of
the project might cause a domino effect, affecting other dependent operations and
lengthening the overall project duration. To effectively manage time, project
managers must create precise timetables, routinely check progress, and alter
timelines as needed to accommodate for unexpected delays. Setting realistic
deadlines, employing tools like Gantt charts and the Critical Path Method of
Management (CPM), and prioritizing activities to keep the project on track are all
indications of effective time management.

3. Quality

Meeting the standards and requirements for the project deliverables is the main
emphasis of the quality constraint. High-quality results are vital for meeting
customer expectations and project objectives. However, achieving quality often
involves more time, resources, or money, which can interfere with other project
limitations. Establish quality control and assurance procedures throughout the
project's lifecycle. Regular testing, inspections, and reviews are essential for
making certain the project output satisfies the specified standards while
remaining within other limits.

4. Resources

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper masterstudy. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €2,47. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 70055 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€2,47
  • (0)
  Kopen