LEED BD&C Test #1 Questions And Answers Well Elaborated Graded A+.
5 keer bekeken 0 keer verkocht
Vak
LEED VA GA
Instelling
LEED VA GA
The LEED Project boundary may not include land that is owned by a party other than that which owns the LEED project unless:
A) The land will be donated for the purposes of earning an ID point
B) The Land associated with and supports normal building operations for the LEED Project building
C) T...
The LEED Project boundary may not include land that is owned by a party other than that which owns
the LEED project unless:
A) The land will be donated for the purposes of earning an ID point
B) The Land associated with and supports normal building operations for the LEED Project building
C) The land is part of a larger campus project
D) The Land will be included in a future LEED certification - correct answer The Land
is associated with and supports normal building operations for the LEED Project building.
The LEED Pilot Credit for Occupant Engagement is listed only for the O+M rating systems. What is true
about a LEED BD+C project's ability to use the credit on the project?
A) If the pilot credit does not have your rating system listed as applicable, the project cannot pursue the
pilot credit Occupant Engagment is not part of the BD+C rating systems
B) The project could use the pilot credit as an innovation credit without any approval
C) The project could use the pilot credit as an innovation credit if the LEED Credit reviewer approves the
request
D) The project cannot use this credit because Occupant Engagement is already part of the LEED v4 BD+C
rating system. - correct answer If the pilot credit does not have your rating system
listed as applicable, the project cannt pursue the pilot credit Occupant Engagment is not part of the
BD+C rating systems.
A project team is conducting energy modeling as a design is being finalized. Which statement is true
about the resulting model?
A) The model would assist with earning integrative process credit
B) The model can inform the decisions about the massing and building orientation
C) The model inform the decisions about the massing and the building orientation
,D) The value will be limited, except as a compliance tool to estimate the energy savings of the design. -
correct answer The value will be limited, except as a compliance tool to estimate
the energy savings of the design.
A national park located in MLO lighting zone 2 has walking paths around a lake, a 150-car parking lot, a
national flag in from of the visitors center and a small amphitheater for giving presentations. The road
leading to the park has government mandated lighting. What exterior lighting would be exempt from SS
credit light pollution Reduction?
A) Walking paths, landscape lighting and parking lot
B) Roadway, national flag, and parking lot
C) Parking lot, roadway and walking paths
D) National flag, the amphitheater and the roadway - correct answer National Flag,
The Amphitheater, and the roadway
A school project is located within 1.5 miles walking distance from 916 students in grades 9-12. The
school is expected to have 1,200 students when complete. The school has built two walking and biking
routes, one going north and the other south. The school has a busing system that uses 6 buses. What is
true about the project's ability to earn LT Credit Access to Quality Transit?
A) The project has earned credit
B) The project would need to add two more buses
C) The project would need to provide discount public bus stop next tot he school entrance
D) The project would need the city to put a public bus stop next to the school entrance - correct answer
The project has earned the credit.
A project team is reviewing Type III EPDs for the impact reduction of different office chairs in the
following categories:
Global warming potential (greenhouse gases)
Depletion of the stratospheric ozone layer
Acidification of land and water sources
Eutrophication
,Formation of tropospheric ozone
Depletion of nonrenewable energy resources
For product optimization, which factor must the chairs possess?
A) A 10% reduction in GHG emissions and a 10% reduction in at least two other categories
B) A 5% reduction in all categories
C) A 10% reduction in at least three categories
D) A reduction below the industry average in at least three categories - correct answer
A reduction below the industry average in at least three categories.
Which non-mandatory steps could a project team take prior to conducting air-quality testing that would
improve the test results for EQ Credit IAQ Assessment?
(Choose Two)
A) Test and balance the HVAC system
B) Install finishes and furniture
C) Clean with low-emitting cleaning products
D) Complete punch-list items that would generate VOCs or other contaminants
E) Vacuum using a vacuum cleaner with filtration media - correct answer Clean with
low-emitting cleaning products
Vacuum using a vacuum cleaner with filtration media
A developer has purchase a blighted 100,000 SF ( 9,202 m2) warehouse. Part of the roof and one of the
exterior walls, totaling 30,000 SF (2,787 m2) are structurally unsound and must be demolished. The
developer will maintain 60,000 SF (5,574 SF) of the surface area of the building. Which statement is true
about the project team's ability to earn MR Credit Building Life-Cycle Impact Reduction?
A) The project team can pursue Option 2 Renovation of Abandoned or Blighted Building without any
additional design changes.
, B) The project team cannot earn the credit.
C) The project team can pursue Option 2 Renovation of Abandoned or Blighted Building if an additional
10,000 SF (929 m2) of the surface area is preserved.
D) The project team can pursue Option 3 Building and Material Reuse. - correct answer
The project team can pursue Option 3 building and Material Reuse.
Which water end use, if present on a project, does NOT need to be metered for WE prerequisite
Building-Level Water Metering?
A) A rainwater collection system
B) An on-site potable water treatment system
C) An on-site well
D) A public water supply - correct answer A rainwater collection system - Only
potable water end uses must be metered.
An office is relocating to a new facility in another state. Any furniture and furnishings
that are relocated to the new site can contribute as a reused material for MR Credit
Building Product Disclosure and Optimization - Sourcing of Raw Materials if these materials were
purchased:
A) At least 5 years prior to the project's certification
B) At least 2 years prior to the date of project registration
C) Within the past 5 years
D) At least 2 years prior to the project's substantial completion - correct answer At
least 2 years prior to the date of project registration
Which qualifying product must always be included in MR credits? (Choose 3)
A) Interior paint
B) Ceiling tiles
C) Fire suppression system
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper RealGrades. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €16,55. Je zit daarna nergens aan vast.