The part of the load chart governed by stability is based on what percentage of capacity while a crawler crane is working over the side quadrant? - ANSWER A. 75%
The most unstable working quadrant for a crawler crane is the; - ANSWER Side
The lattice boom is designed to take winds of up to 20...
the lattice boom is designed to take winds of up t
the part of the load chart governed by stability i
Geschreven voor
NCCCO Lattice Boom
NCCCO Lattice Boom
Verkoper
Volgen
Exampool
Ontvangen beoordelingen
Voorbeeld van de inhoud
NCCCO Lattice Boom General Knowledge
correct 100%
The lattice boom is designed to take winds of up to 20 mph. from the side plus a
full rated load, plus a direct side load equal to what percent of the rated load? -
ANSWER 2%
The part of the load chart governed by stability is based on what percentage of
capacity while a crawler crane is working over the side quadrant? - ANSWER A.
75%
The most unstable working quadrant for a crawler crane is the; - ANSWER Side
What type of capacity is listed on a crane load chart? - ANSWER Static
If the manufacture of a particular crane does not specifically permit pick and carry
operations what procedure must be followed during this operation? - ANSWER
Don't make any pick and carry lifts
What is the main purpose of a jib/extension? - ANSWER To extend reach higher or
up and over
When the number of layers of rope on a drum increase the line pull___________.
- ANSWER Decreases
, Backward stability of a crane is tested with the crane configured; - ANSWER Basic
boom at maximum angle with no load
How many broken wires must be present in one strand of one lay for running wire
rope to be removed from service? - ANSWER 3
On the majority of conventional cranes the power is transferred to a torque
converter by a; - ANSWER Master clutch
What is the maximum number of broken wires acceptable before a replacement
on a standing wire rope? - ANSWER 2
What is the minimum design factor required for a right regular lay main boom
auxiliary hoist rope? - ANSWER 3.5
The hoist drum shall have always at least _______ full wraps of rope on the drum.
- ANSWER 2
The definition of "Upper-works or Superstructure" refer to the area of the crane; -
ANSWER The structure above the turntable
How many randomly broken wires must there be to remove a running wire rope
from service? - ANSWER 6
Boom length is defined as? - ANSWER Center of the boom attachment pin (heel
pin, foot pin, pivot pin), to the center of the boom tip sheaves
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper Exampool. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €15,13. Je zit daarna nergens aan vast.