100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
P370 Final || Questions and 100% Verified Answers. €10,57   In winkelwagen

Tentamen (uitwerkingen)

P370 Final || Questions and 100% Verified Answers.

 0 keer bekeken  0 keer verkocht
  • Vak
  • P370
  • Instelling
  • P370

aggregate production planning correct answers a managerial statement of time-phased production rates, work-force levels, and inventory investment, which takes into account customer requirements and capacity limitations - helps us attain our goals in the best way possible - Tactical Planning - ...

[Meer zien]

Voorbeeld 2 van de 12  pagina's

  • 29 september 2024
  • 12
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • P370
  • P370
avatar-seller
P370 Final || Questions and 100% Verified Answers.
aggregate production planning correct answers a managerial statement of time-phased production
rates, work-force levels, and inventory investment, which takes into account customer
requirements and capacity limitations

- helps us attain our goals in the best way possible
- Tactical Planning
- helps us make decisions around our 3 capital intensive resources (production rates, workforce
levels, and inventory investment)

characteristics of APP correct answers 1. Aggregate: to combine
- classes of products
- labor or other inputs
- geographic location of production
- often fictitious (abstract)

2. Time Horizon: MEDIUM TERM
- APP is the plan with the longest time horizon

3. Time Buckets: divisions of horizons

4. The actual length of the horizon and the size of the time buckets it is divided into will vary
depending on the NATURE OF YOUR BUSINESS
- industry with rapid new product development/high variability will have SHORT HORIZON
with SHORT TIME BUCKETS
- industry with long lead times and stable products will have LONGER HORIZONS and/or
LARGER TIME BUCKETS
- typically one year with one month buckets

3. Executed on Rolling Horizon basis along with all other levels of plans
- working into the future; means that we do not wait for the entire plan to have been executed to
develop a new one

Lower Levels of Planning (after APP) correct answers Gets more specific as we go down:

1. Master Production Scheduling (MPS)—after APP
- 1st level of disaggregation of the aggregate plan
- begin to "break down" the "products" into more real end product items
- horizon and buckets are NO LARGER than APP (OFTEN SHORTER)
- typically implemented on rolling horizon
- typically formulated and evaluated at a lower organizational level than the APP

2. Material Requirements Planning (MRP)—after MPS
- Extreme detail, down to each nut and bolt
- no "fictitious, aggregated" products are used

, 3. Shop Floor Scheduling—after MRP
- detailed, actual production schedule

Three Pure "General" Aggregate Plans (uses labor, production rate, inventory) correct answers 1.
Chase
- Inventory constant
- production and labor fluctuate to perfectly match demand and thus maintain no inventory
- OPPOSITE OF LEVEL
- aka amount produced in any given period is equal to the minimum amount required to satisfy
demand for that period (EI in any given period is 0)
- hiring and firing workers
- use chase: when highly seasonal, when holding costs are high, unskilled labor, short product
life cycle, perishable goods, services

2. Level
- Inventory fluctuates
- Constant workforce/production level, allowing changes in inventory to buffer you from the
changes in demand level

3. Stable Workforce -- Variable Hours
- size of workforce is constant, but number of hours worked fluctuates
- allows variable working hours to buffer against variation
- allows production to vary from period to period, with the intent of keeping inventory as low as
possible (aka EI is 0); however, don't hire and fire workers, just alter the number of hours they
need to work

Inventory Balance Equation correct answers Ending Inventory = Beginning Inventory +
Production - Demand

Types of Inventory correct answers 1. Raw material: inventory which has not yet undergone any
transformation by the company
- can be highly processed parts, just so long as all processing was performed outside of the
operational unit in question
- procurement agent: purchases raw materials; is the stakeholder

2. Work-in-process (WIP): inventory which has already undergone some transformation by the
operational unit, but is not yet completed
- Scheduling people run this and are the stakeholders

3. Finished good: inventory which has undergone all transformations to be performed at the
operational unit, and which is therefore ready to be passed onto the customer
- marketing is the stakeholder

Reasons for Holding Inventory correct answers 1. Safety stock: inventory which is being held to
buffer against some form of uncertainty

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper FullyFocus. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €10,57. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 76449 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€10,57
  • (0)
  Kopen