Tentamen (uitwerkingen)
SDI Open Water Test Questions and Complete Solutions
- Vak
- Instelling
Describe all the steps to assemble a BCD and regulator to a scuba cylinder. Spin the tank around so that the back of the valve is facing you. Place the BCD band(s) over the top of the cylinder so that the back of the BCD is facing you. Raise or lower the BCD so the top is even with the cylinder val...
[Meer zien]