100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
Admin Final - UTC OTD Exam Questions and Answers €12,77   In winkelwagen

Tentamen (uitwerkingen)

Admin Final - UTC OTD Exam Questions and Answers

 7 keer bekeken  0 keer verkocht
  • Vak
  • OTD
  • Instelling
  • OTD

Admin Final - UTC OTD Exam Questions and Answers

Voorbeeld 4 van de 46  pagina's

  • 15 oktober 2024
  • 46
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • OTD
  • OTD
avatar-seller
Admin Final - UTC OTD Exam Questions
and Answers


Control Chart

Type of line graph showing performance in relation to a set of upper and lower
control limits. A process is typically said to be "in control" if the graphed data
points continuously fall between upper and lower control limits.




Fishbone Diagram

A method used to identify and document causes to the problem (effect) being
studied; AKA "cause-and-effect" diagram




Histogram

Type of bar chart where frequency distribution is shown by means of "bars" or
rectangles




Multivoting or Nominal Group Technique

,Method of team voting used to decrease many choices to an important few

Pareto Chart

The concept that 80% of the problem is caused by 20% of the contributing root
causes

Pilot Test

A small-scale implementation often used to test a possible solution

Plan-Do-Act-Study (PDSA)

The commonly recognized process improvement cycle often used in CQI projects

Process Flow Diagrams

Graphic representations of the steps and decision points in any process




Return on Investment (ROI)

A calculation of what was gained from doing a project minus what was invested in
doing the project, typically expressed in terms of dollars

Root Cause Analysis

A method used to analyze the underlying reason(s) for a problem. The "root
cause" is what causes the problem to occur repeatedly

Run Chart

Type of line graph that shows changes in data over time

,Statistical Process Control

The principle that variation from common-cause systems should be left to chance,
but special causes of variation should be identified and eliminated

Stratification

Breaking data into categories such as by time, date, location, referral source, and
so on

1) Setting Direction
2) People Development
3) Key Processes and Tools

What are the 3 characteristics of CQI?

- Current: Consistent with today's competitors and benchmarks
- Calculable: Measurable
- Completeable: Reasonable and realistically accomplished
- Consensus-Based: Identified and supported by key stakeholders involved in the
process; consideration of resources/resource limitations
- Consistent with Organizational Goals: Align with mission/vision of organization

What are the 5 C's of valid customer requirements?

Quality assurance is only concerned with gathering data about stable processes
and taking action when major problems arise; continuous quality improvement is
about not only monitoring performance, but also identifying opportunities to
improve processes BEFORE major problems arise.

What is the fundamental difference between QA and CQI?

, - Plan: Identify and define the problem and aim --> Assess current situation
(process flow, cause and effect, baseline data) --> Develop solutions
- Do: Implement/test solutions
- Study: Learn from the results
- Act: Revise or implement solutions

What is involved in the PDSA process?

1) Awareness: Create organizational awareness by highlighting current problems
and discussing successes of CQI with staff
2) Knowledge: Build foundation and skill; top-down and bottom-up (typical)
3) Implementation: Decentralize ownership from leadership to all levels of the
organization
4) Integration: Establish way of doing business by integrating CQI into daily work

What are the 4 methods involved in the process of fully integrating a CQI into a
department?

- Improving product features
- Freedom from deficiencies

What two types of beneficial change did Juran recommend?

- Increase customer satisfaction with practitioner knowledge, helpfulness, and
courtesy
- Reduce cycle time (time from date of referral to date of first appointment)
- Reduce number of complaints (decrease wait times/delays and billing errors)
- Increase productivity levels

How can we improve product features?

- Compliance (lack of adherence to policy or regulatory requirements)
- Patient Safety (falls etc.)
- Quality (undesired outcomes)

What types of deficiencies should we avoid?

d. All of the above

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper millyphilip. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €12,77. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 73918 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€12,77
  • (0)
  Kopen