100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
LEED Final Exam LATEST SOLUTION 2024/25 GUARANTEED GRADE A+ €11,45   In winkelwagen

Tentamen (uitwerkingen)

LEED Final Exam LATEST SOLUTION 2024/25 GUARANTEED GRADE A+

 6 keer bekeken  0 keer verkocht
  • Vak
  • LEED Fnal Exm
  • Instelling
  • LEED Fnal Exm

Green Associate The LEED ___ credential denotes general knowledge of green design, construction, and operations. Biogas ___ is generated from decomposing organic matter, such as food or animal waste, which is processed in an anaerobic digester. elimination of waste Lean process improvement is ...

[Meer zien]

Voorbeeld 2 van de 15  pagina's

  • 16 oktober 2024
  • 15
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • LEED Fnal Exm
  • LEED Fnal Exm
avatar-seller
LEED Final Exam LATEST SOLUTION
2024/25 GUARANTEED GRADE A+
Green Associate
The LEED ___ credential denotes general knowledge of green design,
construction, and operations.
Biogas
___ is generated from decomposing organic matter, such as food or
animal waste, which is processed in an anaerobic digester.
elimination of waste
Lean process improvement is the principle of continuously improving
any process through the ___ in every step of manufacturing.
sustainability
A(n) ___ director would be responsible for activities such as
creating energy efficiency and water conservation strategies.
aeroponic
Many menus are also being influenced by the products of ___ gardens,
which are gardens without a soil system.
sustainable
The integration of sustainability into urban planning has given birth
to the popular term "___ city."
U.S. Green Building Council
The names and photos of credentialed individuals are published in the
online ___ directory, which employers can use for verification
purposes.
Energy consultants
___ analyze energy-usage data to create actionable solutions for
energy efficiency.
triple bottom line
The ___ involves the social, environmental, and economic dimensions
of an organization.
90
Induction cooktops can be used in kitchens as a sustainable practice
because they transfer ___% of their heat to pots.
200
The LEED® Green Associate™ exam is scored out of ___ points.
100
The exam consists of ___ multiple-choice questions.
170
A score of ___ is required for passing the exam.
Application

, ___ items give a candidate a problem or situation that they can solve
using the concepts from the reference material.
15
Every two years, a Green Associate must report ___ hours of
continuing education.
LEED v4 Green Associate Candidate Handbook
The first step in preparing for the exam is to read the ___.
project types
Each rating system includes adaptations with unique checklists that
address specific ___.
New Construction
Memorizing the LEED BD+C: ___ checklist for the LEED Green Associate
exam can be one important factor for exam day success.
three months
An individual with no familiarity with LEED should expect to spend
___ studying for the exam if that individual works or is a full-time
student.
first
When you are taking the exam, a tip to consider is that usually your
___ answer is the correct one.
Those who must live with the decisions and those who must carry them
out.
The term "stakeholder" encompasses more than just decision makers and
includes:
Reverse Contribution to Global Climate Change
What is the most critical impact category out of the seven, meaning
the largest environmental impact, as determined by USGBC?
The process brings together the project team with stakeholders and
outside experts for creative thinking and collaboration
A charrette is:
Both the individual elements of the system and their relationships to
each other as a whole
When applying systems thinking to designing building and communities,
we must understand:
Life-cycle costs
A major consideration when developing a sustainable project budget is:
Triple bottom line
Social responsibility, environmental stewardship, and economic
prosperity are three components of the:
Integrative Process (1)
A new credit in LEED v4 that encourages early analysis of energy,
site, and water systems to inform design is:
Integrative Process (2)

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper Allan100. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €11,45. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 83750 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€11,45
  • (0)
  Kopen