100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
Public-Private Partnership Exam Questions With 100% Verified Answers €10,31   In winkelwagen

Tentamen (uitwerkingen)

Public-Private Partnership Exam Questions With 100% Verified Answers

 0 keer bekeken  0 keer verkocht
  • Vak
  • Public-Private Partnership
  • Instelling
  • Public-Private Partnership

Public-Private Partnership Exam Questions With 100% Verified Answers Macro-economic Risk - answerRisks such as currency exchange-rate movements (where a project has revenues in one currency but debt in another), interest-rate fluctuations, or inflation. Availability based PPP - answerThe public...

[Meer zien]

Voorbeeld 2 van de 5  pagina's

  • 20 oktober 2024
  • 5
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • Public-Private Partnership
  • Public-Private Partnership
avatar-seller
©SIRJOEL EXAM SOLUTIONS
11/3/2024 10:54 PM



Public-Private Partnership Exam Questions
With 100% Verified Answers


Macro-economic Risk - answer✔Risks such as currency exchange-rate movements (where a

project has revenues in one currency but debt in another), interest-rate fluctuations, or inflation.


Availability based PPP - answer✔The public authority pays the project company for making the

project available. Examples include social-infrastructure projects such as schools and hospitals,

and government accommodation.


Unsolicited bids - answer✔The success rate of PPPs derived from ______ _________ is quite

low: contracts are often awarded to bidders that have little hope of pulling together both the

financing and the expertise, and such bids divert government personnel away from a running a

well-managed PPP program.


Affordability - answer✔This has been one of the main obstacles to development of social-sector

PPPs (e.g. schools and hospitals) in the region. Government budgets can be predicted for only a

relatively short term, but a social-sector PPP needs to be paid for over a prolonged period.

Similarly, in the case of a toll-road, the tolls have to be affordable for drivers.


Construction Phase - answer✔This is usually the high-risk phase of a PPP

, ©SIRJOEL EXAM SOLUTIONS
11/3/2024 10:54 PM


Risk Transfer - answer✔Some of the Case Studies show that significant losses, e.g. resulting

from unexpected ground conditions, can be incurred by the private sector, so illustrating that real

______. ________ is taking place.


Governance - answer✔PPP procurements require an appropriate governance structure. This is

typically on three levels:

› a project team consisting of civil servants and their advisers (including someone from the

country's central PPP unit) working on the project on a day-to-day basis, preparing specifications

and the PPP contract, negotiating with bidders, and so on;

› a project board consisting of senior civil servants at or near permanent secretary level from both

the line ministry, the ministry of finance and other relevant government bodies, which supervises

the team;

› the project board reports to ministers and in due course seeks their approval to proceed with the

project when the procurement is finalized.


Asset Revision - answer✔When most PPP contracts come to an end the infrastructure asset is

returned to public-sector control. (PPP assets usually remain in the ownership of the public

sector throughout the term of a PPP contract.)


Concessions - answer✔At the same time, government should resist the temptation to interfere

with a PPP project—for example, putting pressure on a toll-road concession not to increase its

tolls even though this is allowed in the concessions agreement.

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper sirjoel. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €10,31. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 66579 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€10,31
  • (0)
  Kopen