100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
IDPX PRACTICE TEST - 85 QUESTIONS & ANSWERS €12,14   In winkelwagen

Tentamen (uitwerkingen)

IDPX PRACTICE TEST - 85 QUESTIONS & ANSWERS

 4 keer bekeken  0 keer verkocht
  • Vak
  • IDPX
  • Instelling
  • IDPX

IDPX PRACTICE TEST - 85 QUESTIONS & ANSWERS

Voorbeeld 2 van de 12  pagina's

  • 28 oktober 2024
  • 12
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • IDPX
  • IDPX
avatar-seller
IDPX PRACTICE TEST - 85 QUESTIONS & ANSWERS

What is the MOST important reason to include expert experiential knowledge from an
architectural consultant firm?
A-They provide experimental data on research studies
B-They bring project-based observations and insights
C-They have access to a network of professionals
D-They have access to a database of resources
B- They bring project-based observations and insights.
Which of the following is an advantage of the full wall schedule technique over other
scheduling techniques?
A-Bar charts are simple to make and understand and are suitable for all project sizes.
B-Each activity is given a starting and finishing date, and overlaps are indicated by
overlapping bars for each activity.
C-This schedule graphically depicts all the tasks required required to complete a
project, the sequence in which they must occur, their duration, the earliest or latest
possible starting time, and the earliest or latest possible finishing time.
D-This schedule serves as a starting point for discussion among everyone on the
project team and becomes a collaborative, interactive exercise until an agreement is
reached.
D-This schedule serves as a starting point for discussion among everyone on the
project team and becomes a collaborative, interactive exercise until an agreement is
reached.
What are the differences between GANNT/BAR CHART, CPM CHART (critical path
method), and FULL WALL SCHEDULE?
The Gantt or bar chart is simple to make and understand. In this method each activity is
given a starting and finishing date and overlaps in the activity timeframe are illustrated
by the overlapping bars.

A CPM or Critical Path Method chart depicts all the tasks required required to complete
a project, the sequence in which they must occur, their duration, the earliest or latest
possible starting time, and the earliest or latest possible finishing time.

A full wall schedule involves all members of the design and construction team, including
the client, to create an interactive and collaborative schedule that all members can
adjust as needed until all parties are in agreement. At that point, the schedule can then
be copied down to a smaller format and shared by all members of the team.

, The project manager is involved in the initial determination of the scope of work and
estimation of fees.
Which of the following is not under the project manager's responsibility during this
phase?

A-Quality Planning
B-Fee Projection
C-Monitoring
D-Time Planning
C-Monitoring

Monitoring falls during the progress of the project rather than the initial phase of
planning for time, fees, and quality.
All of the following steps are part of the project close out except?

A-respond to owner's questions and problems during period immediately after move in
process
B-verify owner has received all lien waivers
C-final application and certificate for payment
D-verify issuance of certificate of occupancy
D-verify issuance of certificate of occupancy
Which of the following is NOT typically included in an owner-designer agreement?

A-termination clause
B-contractor name and contact information
C-method of payment
D-ownership of documents
B-contractor name and contact information

Contractor is decided AFTER this contract/agreement is signed.
Which type of insurance would protect the interior designer if an error in the drawings
cause the incorrect placement of a bay window in the project?

A-professional liability insurance
B-contractor's insurance
C-property insurance
D-construction insurance
A-professional liability insurance

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper GEEKA. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €12,14. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 75323 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€12,14
  • (0)
  Kopen