Tentamen (uitwerkingen)
SDI OPEN WATER EXAM LATEST UPDATE
- Vak
- Instelling
SDI OPEN WATER EXAM LATEST UPDATE Describe all the steps to assemble a BCD and regulator to a scuba cylinder. - Spin the tank around so that the back of the valve is facing you. Place the BCD band(s) over the top of the cylinder so that the back of the BCD is facing you. Raise or lower the ...
[Meer zien]