Basics covered in Level 1 -Correct Answer Nuclear Testing Speedy Moisture Report Forms Earthwork has to do with the roadway in what way? -Correct Answer Earthwork is the excavation and placement of soils and materials supporting the proposed roadway. In Earthwork what is a lift? -Correct An...

[Meer zien]

Voorbeeld 2 van de 6  pagina's

  • 5 november 2024
  • 6
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • FDOT
  • FDOT
avatar-seller
FDOT Earthwork Level 1



FDOT Earthwork Level 1 Exam
Questions and Answers
Basics covered in Level 1 -Correct Answer ✔Nuclear Testing
Speedy Moisture
Report Forms

Earthwork has to do with the roadway in what way? -Correct Answer ✔Earthwork is the
excavation and placement of soils and materials supporting the proposed roadway.

In Earthwork what is a lift? -Correct Answer ✔6" of compacted depth at full width

In Earthwork what is a Lot? -Correct Answer ✔A lot is 1 lift at 500 ft or within compacted
area. Isolated compaction operations are separate lots.

Sampling at the roadway is done for -Correct Answer ✔Done for base, sub grade, and
embankment.

Sampling is determined how -Correct Answer ✔generated with random numbers usually
by a Verification Inspector

What is important about sampling at the roadway -Correct Answer ✔Minimum of three
representative sample combined.

What is LIMS? -Correct Answer ✔Laboratory Info Management System

The proctor theory is when compaction is achieved how -Correct Answer ✔by inputting
energy to expel air and water in the soil voids

Compaction causes -Correct Answer ✔An increase in unit weight, decrease in
compressibility and permeability.

The proctor is determined where and creates what -Correct Answer ✔In a laboratory
and establishes a density standard to be used on the roadway

Lab proctors are created how -Correct Answer ✔Material is gathered from the road and
prepared with different amounts of water then placed in molds and hammered

What is a modified proctor used in -Correct Answer ✔It is used in base, sub grade, MSE
wall back fill materials




FDOT Earthwork Level 1

, FDOT Earthwork Level 1


Modified proctors are created how -Correct Answer ✔With a 10lb hammer(rammer) on a
18" drop with 56 blows per layers with 5 layers in total.

What is a standard proctor used in -Correct Answer ✔It is used in embankment and
structure back fill materials

Standard proctors are created how -Correct Answer ✔With a 5.5lb hammer(rammer) on
a 12" drop with 25 blows per layer with 3 layers in total

Comparison between VT and QC density test tolerance -Correct Answer ✔2 lbs/pcf

What is the STRG -Correct Answer ✔Sampling, Testing, and Reporting Guide (state
wide)

A job guide schedule is -Correct Answer ✔project specific

The material identification number for embankment in the laboratory is -Correct Answer
✔004L

The material identification number for embankment in the field is -Correct Answer
✔004F

The material identification number for base is -Correct Answer ✔030

PP is short for -Correct Answer ✔project personel

Sampling in the field it is important to -Correct Answer ✔sample each type of material
and have enough for a representative sample

When to secure samples -Correct Answer ✔After material is placed but before
compaction effort is applied

Sample transmittal card the source uses what code for the jobsite -Correct Answer ✔08

For material description the minimum is always -Correct Answer ✔Color and texture

On sample bags be sure to put -Correct Answer ✔Project #
Sample #
Location

What is the document that itemizes the minimum requirements for sampling and
testing? -Correct Answer ✔Sampling, testing, reporting guide

Unit weight is -Correct Answer ✔the weight of a material occupying a volume


FDOT Earthwork Level 1

Dit zijn jouw voordelen als je samenvattingen koopt bij Stuvia:

Bewezen kwaliteit door reviews

Bewezen kwaliteit door reviews

Studenten hebben al meer dan 850.000 samenvattingen beoordeeld. Zo weet jij zeker dat je de beste keuze maakt!

In een paar klikken geregeld

In een paar klikken geregeld

Geen gedoe — betaal gewoon eenmalig met iDeal, creditcard of je Stuvia-tegoed en je bent klaar. Geen abonnement nodig.

Direct to-the-point

Direct to-the-point

Studenten maken samenvattingen voor studenten. Dat betekent: actuele inhoud waar jij écht wat aan hebt. Geen overbodige details!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper PossibleA. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €11,57. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 68175 samenvattingen verkocht

Opgericht in 2010, al 15 jaar dé plek om samenvattingen te kopen

Begin nu gratis
€11,57
  • (0)
In winkelwagen
Toegevoegd