100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
PMG202c P5 MULTIPLE CHOICE QUESTIONS AND ACCURATE SOLUTIONS RATED A. €16,65   In winkelwagen

Tentamen (uitwerkingen)

PMG202c P5 MULTIPLE CHOICE QUESTIONS AND ACCURATE SOLUTIONS RATED A.

 1 keer bekeken  0 keer verkocht
  • Vak
  • PMG202c
  • Instelling
  • PMG202c

PMG202c P5 MULTIPLE CHOICE QUESTIONS AND ACCURATE SOLUTIONS RATED A.

Voorbeeld 4 van de 31  pagina's

  • 12 november 2024
  • 31
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Onbekend
  • PMG202c
  • PMG202c
avatar-seller
PMG202c P5 MULTIPLE CHOICE QUESTIONS
AND ACCURATE SOLUTIONS RATED A.
As a project manager, you learn a customer is not satisfied with the quality
of a finished product. You have already identified the root cause and
brainstormed solutions to the problem with the team. Now, you and the
team attempt to fix the problem by implementing a solution. Which PDCA
step did you apply?

a. Plan
b. Do
c. Check
d. Act
b
Which parts of a company ecosystem rely on continuous improvement to
have collective and separate successes? Select all that apply.

a. Programs
b. Performances
c. Portfolios
d. Projects
acd
Fill in the blank: The way a project manager decides to structure a
retrospective depends on _____.

a. the previous project manager's agenda
b. team and workplace
c. project sponsor preference
d. the latest project management trends
b

,As a project manager, you hold a retrospective. During the meeting, you give
the team an opportunity to discuss risks that materialized: Were there any
gaps between the original plan and its execution? Which retrospective step
does this represent?

a. Next steps
b. Future considerations
c. Lessons learned
d. Action items
c
As a project manager, you're overseeing a product launch. You meet with
customers to determine the product's quality standards. Then, you create
processes and documentation necessary to achieve the expected quality.
Which quality management concept do these tasks represent?

a. Assurance standards
b. Assurance planning
c. Quality planning
d. Quality control
c
Which quality management concept must be well-defined at the beginning
of the project to help avoid rework and schedule delays?

a. Quality control
b. Quality action
c. Quality standards
d. Quality assurance
c
As a project manager, you identified a process-based problem you'd like to
improve, found its root cause, and implemented a solution. Now, you

,monitor the new process to ensure the changes are beneficial to the team.
Which DMAIC step are you currently applying?

a. Analyze
b. Define
c. Control
d. Measure
c
As a project manager, you're doing a user acceptance test (UAT) to test your
product. You present your users with the visual mockup of the product and
walk them through each step they need to take to use the product. What UAT
quality control step does this scenario represent?

a. Critical user journey
b. Edge case journey
c. User story
d. Acceptance criteria
a
As a project manager, you identify a process-based problem you'd like to
improve. To better understand the problem, you examine the technology to
understand its root cause and interview the team on how it's impacting their
performance. Which DMAIC step did you apply?

a. Measure
b. Define
c. Analyze
d. Control
c
A project team discovers an efficient process to more quickly develop a
product. The program manager implements the idea in several other

, projects. When the portfolio manager learns that the more efficient process
is working across several projects, they recommend it to several programs.
This scenario exemplifies which best practice?

a. Positive feedback
b. Continuous improvement
c. Word-of-mouth communication
d. Hierarchical communication
c
What's the main purpose of holding a retrospective?

a. Determine why the team missed a milestone and update the client
b. Allow the project manager to explain why the project did or did not
succeed
c. Encourage improvements that prepare the team for future projects
d. Let stakeholders give feedback so the team can get a different
perspective
c
A project manager sets clear expectations with customers about when
they'll communicate certain project updates and changes. To gain the
customers' confidence, the project manager also provides situational
examples of when they may communicate. Which soft skill does this project
manager use with their customers?

a. Trust-building
b. Negotiation
c. Empathic listening
d. Quality planning
a

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper saraciousstuvia. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €16,65. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 60904 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€16,65
  • (0)
  Kopen