100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
Summary Information Technology Project Management - 2019 €4,99
In winkelwagen

Samenvatting

Summary Information Technology Project Management - 2019

 106 keer bekeken  3 keer verkocht

Summary of Information Technology Project Management - 2019 Ch: 1, 2, 3, 5, 6, 7, 8, 9, 10, 11, 12 articles 3 trail exam questions

Voorbeeld 4 van de 89  pagina's

  • Nee
  • 1, 2, 3, 5, 6, 7, 8, 9, 10, 11, 12
  • 2 maart 2020
  • 89
  • 2018/2019
  • Samenvatting
book image

Titel boek:

Auteur(s):

  • Uitgave:
  • ISBN:
  • Druk:
Alle documenten voor dit vak (5)
avatar-seller
marobo
Information Technology Project
Management
Index
Chapter 1: The Nature of Information Technology Projects...............................................................4
1.1 Introduction..............................................................................................................................4
1.2 What is a project?.....................................................................................................................4
1.3 What is project management?.................................................................................................5
1.4 The state of IT project management.........................................................................................6
Chapter 2: Project Methodologies and Processes..............................................................................8
2.1 Introduction..............................................................................................................................8
2.2 The project life cycle.................................................................................................................8
2.3 The project management body of knowledge (PMBOK)...........................................................9
2.4 Project Processes....................................................................................................................10
2.5 PRINCE2..................................................................................................................................10
2.6 The systems development life cycle (SDLC)............................................................................12
2.7 Learning cycles and lessons learned.......................................................................................14
Chapter 3: Measurable Organizational Value and the Business Case...............................................16
3.1 Introduction............................................................................................................................16
3.2 Measurable organizational value (MOV)................................................................................16
3.3 The business case...................................................................................................................17
3.4 Project selection and approval...............................................................................................19
Chapter 5: Project Planning: Scope and the Work Breakdown Structure.........................................20
5.1 Introduction............................................................................................................................20
5.2 The triple constraint...............................................................................................................20
5.3 Defining and managing project scope.....................................................................................20
5.4 Validate scope.........................................................................................................................23
5.5 Control scope..........................................................................................................................23
5.6 The work breakdown structure (WBS)....................................................................................23
5.7 Project estimation...................................................................................................................24
Chapter 6: Project Planning: The Schedule and Budget....................................................................26
6.1 Introduction............................................................................................................................26
6.2 Developing the project schedule............................................................................................26
6.3 Project management software tools.......................................................................................28


1

, 6.4 Developing the project budget...............................................................................................28
6.5 The baseline plan....................................................................................................................29
6.6 The kick-off meeting...............................................................................................................29
Chapter 7: Managing Project Risk.....................................................................................................30
7.1 Introduction............................................................................................................................30
7.2 Create a risk plan....................................................................................................................31
7.3 Identify risk.............................................................................................................................31
7.4 Analyse risk.............................................................................................................................32
7.3 Develop risk strategies............................................................................................................34
7.4 Monitor and control risk.........................................................................................................34
7.5 Respond and evaluate response to risk..................................................................................34
Chapter 8: Managing project stakeholder and communication.......................................................35
8.1 Introduction............................................................................................................................35
8.2 Stakeholder analysis...............................................................................................................35
8.3 Monitoring and controlling the project..................................................................................35
8.4 The project communications plan..........................................................................................35
8.5 Project metrics........................................................................................................................36
8.6 Reporting performance and progress.....................................................................................37
8.7 Information Distribution.........................................................................................................37
Chapter 9: Managing Project Quality................................................................................................38
9.1 Introduction............................................................................................................................38
9.2 Quality philosophies...............................................................................................................38
9.3 Process capability and maturity..............................................................................................39
9.4 The project quality management plan....................................................................................40
Chapter 10: Leading the project team..............................................................................................43
10.1 Introduction..........................................................................................................................43
10.2 Project leadership.................................................................................................................43
10.3 Ethics and leadership............................................................................................................45
10.4 Teams and leadership...........................................................................................................46
10.5 Multicultural projects...........................................................................................................47
Chapter 11: Managing organizational change, resistance and conflict.............................................48
11.1 Introduction..........................................................................................................................48
11.2 The nature of change............................................................................................................48
11.3 The change management plan..............................................................................................49
11.4 Dealing with resistance and conflict.....................................................................................51
Chapter 12: Project completion........................................................................................................53

2

, 12.1 Introduction..........................................................................................................................53
12.2 Product release or system implementation..........................................................................53
12.3 Project closure......................................................................................................................54
12.4 Project evaluation.................................................................................................................55
Important pp slides...............................................................................................................................57
Exam questions.....................................................................................................................................60
Conclusions...........................................................................................................................................61
Articles..................................................................................................................................................62
Article 1 (L1): Embracing Agile (D. K. Rigby, J. Sutherland & H. Takeuchi)........................................62
Get everyone on the same page...................................................................................................64
Don’t change structures right away; change roles instead...........................................................64
Article 2 (L2): No silver bullet – essence and accident in software engineering (F. P. Brooks).........66
Article 3 (L2): A spiral model of software development and enhancement (B. W. Boehm)..............68
Article 4 (L3): The use of decision criteria in selecting information systems / technology
investments (J. Bacon)......................................................................................................................73
Article 5 (L4): Policy analysis and decision making in a network: how to improve the quality of
analysis and the impact on decision making. (H. De Bruijn & E. Ten Heuvelhof)..............................75
Article 6 (L4): What to do when Stakeholders matter (J. M. Bryson)................................................77
Article 7 (L5): Agile project management (T. Byba, N. B. Moe & T. Bingsoyr)...................................79
Article 8 (L5): Continuous software engineering: A roadmap and agenda (B. Fitzgerald, K. Stol).....84
Article 9 (L6): Teamwork quality and project success in software development: A survey of agile
development teams (Y. Lindsjørn, D. I. K. Sjøberg, T. Dingsøyr, G. R. Bergersen & T. Dybå)............86
Article 10 (L6): Same article as 8 - Continuous Software Engineering: A roadmap and agenda.......87
Article 11 (L8): The space shuttle Challenger disaster: A study in organizational ethics...................88




3

, Chapter 1: The Nature of Information Technology Projects
Chapter objectives:
 Why IT projects are organizational investments.
 Why projects are planned organizational change and why they must align with the
organization’s business strategy.
 Define a project and describe the attributes.
 Define the discipline project management.
 Understand the relationship among project portfolios, programs and projects.
 Understand how the disciplines of IT and project management have evolved together and
have led to how projects are manged today.
 Understand the current state of IT project management.
 Understand why some projects fail and how to improve the likelihood of success.



1.1 Introduction
Information technology (IT) projects are organizational events, it commits time, money and resources
and has an expectation of receiving something of value in return. Projects are planned organizational
changes/means for achieving a chosen strategy.
IT projects enable the integration of technology in new products, services or processes that can
change existing relationships between an organization and its customers or suppliers, as well as
among the people within the organization.

1.2 What is a project?
 Project: a temporary endeavour undertaken to create a unique product, service or result.
 Project manager: the person assigned by the performing organization to lead the team that is
responsible for achieving the project objectives.

Common project attributes
 Time frame: Definite beginning and end. A project ends when all the promised work is
completed and the organization’s expectations are met, or it can be terminated when the work
or expectations cannot be met.

 Purpose: A project must have a clear goal that defines the value of the project to the
organization. This is important for setting expectations, defining the work to be done, setting
direction for the project team, developing schedule and budget and when complete to evaluate
its overall success.

 Ownership: A project can have many stakeholders.
o Projects undertaken within an organization support internal customers. E.g. high-level
manager is often called a sponsor.
o External projects developed by third parties support external customers, called clients.

 Resources: Resources provide a means for achieving the project’s goal and completing the work,
they can be a constraint as most organizational resources are limited. Resources include time,
money, people, facilities and technology.

 Project Roles: Projects require people with skill sets that include both technical and nontechnical
(soft) skills. Amount technical skills required is determined by the product, service or systems
that is to be built or implemented.



4

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper marobo. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €4,99. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 53340 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€4,99  3x  verkocht
  • (0)
In winkelwagen
Toegevoegd