100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
RWP PG Exam Questions and Answers €10,73   In winkelwagen

Tentamen (uitwerkingen)

RWP PG Exam Questions and Answers

 0 keer bekeken  0 keer verkocht
  • Vak
  • RWP PG
  • Instelling
  • RWP PG

RWP PG Exam Questions and Answers

Voorbeeld 2 van de 5  pagina's

  • 19 november 2024
  • 5
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • RWP PG
  • RWP PG
avatar-seller
RWP PG Exam Questions and Answers

type of working limits on controlled track - Answers -foul time, exclusive track
occupancy

type of working limits on non-controlled track - Answers -inaccessible track

type of train approach warning - Answers -watchman

type of train approach warning - Answers -individual train detection

What type of work roadway workers do? - Answers -inspection and construction of
track, maintenance of bridges, repair of signal and communication systems, repair of
RMM

True or false. Fouling a track can apply to both people and machinery - Answers -True

Within what distance to the track is a roadway worker considered fouling it? - Answers -
4 feet from the nearest running rail

a what authorizes movements on controlled track. - Answers -Operator/Dispatcher

The RWIC is required to be qualified on physical characteristics when their group is
working on.... - Answers -All tracks

The EIC is an employee who is in charge of.... - Answers -A work group

The main role of the RWIC is.... - Answers -To establish on track safety

When can personal electronic devices be used while on duty? - Answers -If there is an
emergency at the job site and no other forms of communication are available

Prior to performing any task that requires fouling a track or has the potential to foul a
track, all roadway workers must participate in an.... - Answers -on-track safety briefing

The safety briefing must be conducted.... - Answers -At the job location

Whistle boards are required when.... - Answers -5 or more employees are working for
more than 1 hour

When using foul time with off-track equipment for more than 5 minutes on a main track
you must use.... - Answers -a supplemental shunting device

, Local control is used for.... - Answers -C&S inspections/testing or joint C&S and MW
switch inspection

How is a job briefing documented? - Answers -NRPC 4104

When is an on-track safety briefing required? - Answers -When performing any task that
has potential to foul a track.

Who is responsible for establishing on-track safety? - Answers -RWIC

What does foul time ensure for the crew working in the designated area(working limits)?
- Answers -That no trains will operate within the working limits

What information is provide by the RWIC when requesting foul time? - Answers -Name
and title, time limits, track designation, track limits

When is the use of an SSD required? - Answers -Any situation in which equipment is
used for foul time longer than 5 minutes

What allows an RWIC to establish ETO(Exclusive Track Occupancy)? - Answers -
Permission from the dispatcher, flagman stationed at each entrance of working limits,
fixed signals indicating "stop"

When are whistle boards required? - Answers -When working with 5 or more employees
for more than 1 hour

Do whistle boards replace watchman? - Answers -No

All movements made on non-controlled track must be made using.... - Answers -
Restricted Speed

Using restricted speed train/equipment must be able to.... - Answers -Stop within half
the range of vision

What is a method of establishing working limits on non-controlled track? - Answers -
Physically preventing entry

What are the Methods of making a track inaccessible(non-controlled track)? - Answers -
A switch or derail that prevents access, a remotely controlled switch, a discontinuity rail,
a flagman, working limits on controlled track that connects with non-controlled track

All movements made on non-controlled track must be made at.... - Answers -Restricted
Speed

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper millyphilip. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €10,73. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 75057 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
€10,73
  • (0)
  Kopen