100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
logo-home
End of module Quiz for Amazon CMMS Knet training and summery of each module With Correct Solutions!! €13,76   In winkelwagen

Tentamen (uitwerkingen)

End of module Quiz for Amazon CMMS Knet training and summery of each module With Correct Solutions!!

 2 keer bekeken  0 keer verkocht
  • Vak
  • Amazon CMMS Knet training a
  • Instelling
  • Amazon CMMS Knet Training A

Planning is performed by the... - ANSWERFirst-line, general, and top-level supervisors maintain equipment in good operating condition to - ANSWERmeet production goals, minimize downtime, and operate production line safely A Leadman's responsibility is limited to - ANSWERinstructing The fir...

[Meer zien]

Voorbeeld 3 van de 21  pagina's

  • 20 november 2024
  • 21
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • Amazon CMMS Knet training a
  • Amazon CMMS Knet training a
avatar-seller
End of module Quiz for Amazon CMMS
Knet training and summery of each
module With Correct Solutions!!
Planning is performed by the... - ANSWERFirst-line, general, and top-level
supervisors

maintain equipment in good operating condition to - ANSWERmeet production goals,
minimize downtime, and operate production line safely

A Leadman's responsibility is limited to - ANSWERinstructing

The first maintenance organization was a/an - ANSWERline organization

In a functional organization, work is divided according to... - ANSWERequipment
type

An area organization... - ANSWERborrows craftsman as needed

in a centrally controlled organization - ANSWERcontrol is limited in the field, large
projects are handled separately, work is assigned as requests are processed

The written work order used for short duration running repairs is a - ANSWERjob
ticket

There are______________________ types of written orders you could use. -
ANSWERFive types of written orders

Work orders - - ANSWERmajor planned and scheduled tasks

Job tickets - ANSWERShort duration running repairs

standing work orders - ANSWERrepeated job actions

master schedules - ANSWERservice and frequency of work under standing work
order

Special work orders - ANSWERPreventative maintenance

Reserve ______________________ instructions for emergencies, as when a worker
is injured, or a piece of equipment is nearing breakdown - ANSWERVerbal
instructions

It is important for a supervisor to sign the stock issue record T/F - ANSWERfalse

,At different times , maintenance is controlled by the... - ANSWERmaintenance
superintendent

An organization chart - ANSWERcontains all necessary detail

you can overcome resistance to organization changes by - ANSWERadvance
preparation, bargaining, and discussion

Emergencies - - ANSWERwork that must be done immediately

Unscheduled work— - ANSWERrepairs you can delay safely because the equipment
won't deteriorate further.

• Planned and scheduled work— - ANSWERprojects that require much advance
preparation (usually not handled by first-line supervisors).

Which type of maintenance includes the inspection of equipment? -
ANSWERpreventive

scheduling maintenance work is one of the maintenance planners duties t/f -
ANSWERfalse

installing, modifying, and relocating equipment is considered non-maintenance work
and should be funded separately. t/f - ANSWERfalse

the maintenance supervisor can approve schedules for all equipment in the plant t/f -
ANSWERfalse

Project work - ANSWERconstruction, installation, relocation, or modification of
present equipment and buildings

construction - ANSWERbuilding or changing structure of facility

installation - ANSWERinstalling new or rebuilt equipment

equipment modiication - ANSWERmajor changes in existing equipment or facilities

The term maintenance work refers to the repair and upkeep of equipment and
facilities. The work covers preventive maintenance, unscheduled repairs, scheduled
maintenance, emergency repairs, and ______________________ support -
ANSWERfacility

Preventive maintenance - ANSWERmeans any action taken to extend equipment life
or prevent failure before an item malfunctions. It includes inspecting, testing,
lubricating, adjusting, cleaning, and replacing components.

Unscheduled repairs are ______________________ work that can be completed in
less than two manhours. The term also covers work that can be delayed for a short
time with little risk of equipment failure. - ANSWERNonemergency

, Scheduled maintenance refers to major repairs, ______________________, and
overhauls. - ANSWERrebuilds

Emergency repairs - ANSWERare repairs needed immediately

Facility support is a term that covers ______________________work, building and
grounds maintenance, and tool sharpening. - ANSWERjanitorial

unscheduled repairs are usually defined as taking not more than how many
manhours? - ANSWER2

• Adjustments. Minor changes requiring only ______________________ tools, no
parts, and usually less than 0.5 manhours. - ANSWERhand

Backlog - ANSWEREstimated manhours required to complete all work currently
behind schedule. Usually divided into categories according to need: parts and
materials, downtime, manpower, or outside support.

Deferred maintenance. - ANSWERMaintenance you can safely postpone (becomes
part of the backlog).

Equipment repair history. List of repairs made on a piece of equipment that includes
______________________ and cost information. - ANSWERdates

Failure coding - ANSWERList of causes of equipment failure. The causes include
lack of lubrication, operator abuse, and material fatigue, for example.

Inspection - ANSWERChecking equipment to determine needed repairs.

Maintenance work order. A detailed ______________________ request for
maintenance services - ANSWERwritten

Major repairs. - ANSWERExtensive, nonroutine repairs requiring a repair crew.

Minor repairs - ANSWERRepairs completed by one worker using hand tools,
completed in less than two hours. (In many cases, two workers are used for safety's
sake.)

Modification. Change in equipment capability or ______________________. -
ANSWERconfiguration

Overhaul. - ANSWERInspection teardown and repair of equipment to restore it to
effective operating condition.

Planning. Determining the resources and ______________________ needed for a
major job. - ANSWERactions

Priority. - ANSWERListing jobs according to their importance or urgency

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper papersbyjol. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor €13,76. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 67096 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen

Laatst bekeken door jou


€13,76
  • (0)
  Kopen