TEST BANK For Information Technology Project Management 9th Edition by Kathy Schwalbe, Verified Chapters 1 - 13, Complete Newest Version
TEST BANK For Information Technology Project Management 9th Edition by Kathy Schwalbe, Verified Chapters 1 - 13
TEST BANK For Information Technology Project Management 9th Edition by Kathy Schwalbe, Verified Chapters 1 - 13, Complete Newest Version
Alles voor dit studieboek
(47)
Geschreven voor
Information Technology Project Management
Information Technology Project Management
Verkoper
Volgen
Testbankprofessor
Ontvangen beoordelingen
Voorbeeld van de inhoud
FULL TEST BANK
For Information Technology Project Management 9th Edition
by Kathy Schwalbe Latest Update Graded A+
PRINTEND PDF|ORIGINAL DIRECT FROM PUBLISHER|100% VERIFIED
ANSWERS|DOWLOAD IMMEDIATELY AFTER THE ORDER
9TH EDITION
Complete Test Bank, All Chapter Are Included
For More Documents Search (Testbankproferssor.Stuvia)
,Chapter 1: Introduction To Project Management
True/False
1. Until The 1980s, Project Management Primarily Focused On Providing Schedule And Resource Data To
Top Management In The Military, Computer, And Construction Industries.
Ans: T
Until The 1980s, Project Management Primarily Focused On Providing Schedule And Resource Data To
Top Management In The Military, Computer, And Construction Industries. Today’s Project Management
Involves Much More, And People In Every Industry And Every Country Manage Projects.
2. A Difference Between Operations And Projects Is That Operations End When Their Objectives Have
Been Reached, Whereas Projects Do Not.
Ans: F
Projects Are Different From Operations In That They End When Their Objectives Have Been Reached Or
The Project Has Been Terminated.
Pts: 1 Dif: Difficulty: Moderate Ref: P.4
Obj: Lo: 1-2 Nat: Busprog: Analytic Top: What Is A Project?
Key: Bloom's: Comprehension
3. Every Project Should Have A Well-Defined Objective.
Ans: T
A Project Has A Unique Purpose. Every Project Should Have A Well-Defined Objective.
Pts: 1 Dif: Difficulty: Easy Ref: P.6
Obj: Lo: 1-2 Nat: Busprog: Analytic Top: What Is A Project?
Key: Bloom's: Knowledge
4. Projects Should Be Developed In Increments.
Ans: T
A Project Is Developed Using Progressive Elaboration. Projects Are Often Defined Broadly When They
,Begin, And As Time Passes, The Specific Details Of The Project Become Clearer. Therefore, Projects
Should Be Developed In Increments.
Pts: 1 Dif: Difficulty: Moderate Ref: P.6
Obj: Lo: 1-2 Nat: Busprog: Analytic Top: What Is A Project?
Key: Bloom's: Comprehension
, 5. Resources In A Project Should Be Used Effectively Because They Are Limited.
Ans: T
A Project Requires Resources, Often From Various Areas. Resources, However, Are Limited And Must Be
Used Effectively To Meet Project And Other Corporate Goals.
Pts: 1 Dif: Difficulty: Moderate Ref: P. 7
Obj: Lo: 1-2 Nat: Busprog: Analytic Top: What Is A Project?
Key: Bloom's: Comprehension
6. A Project Manager’s Primary Role Is To Provide The Funding For A Project.
Ans: F
A Project Sponsor Usually Provides The Direction And Funding For A Project.
Pts: 1 Dif: Difficulty: Easy Ref: P.7
Obj: Lo: 1-2 Nat: Busprog: Analytic Top: What Is A Project?
Key: Bloom's: Knowledge
7. One Of The Main Reasons Why Project Management Is Challenging Is Because Of The Factor Of Uncertainty.
Ans: T
A Project Involves Uncertainty. Every Project Is Unique And Thus It Is Sometimes Difficult To Define
Its Objectives Clearly, Estimate How Long It Will Take To Complete, Or Determine How Much It Will
Cost. This Uncertainty Is One Of The Main Reasons Project Management Is So Challenging.
Pts: 1 Dif: Difficulty: Moderate Ref: P.7
Obj: Lo: 1-2 Nat: Busprog: Analytic Top: What Is A Project?
Key: Bloom's: Comprehension
8. Questions About How A Team Will Track Schedule Performance Is Related To A Project’s Scope.
Ans: F
Project Scope Deals With Questions Such As, “What Work Will Be Done As Part Of The Project?”, “What
Unique Product, Service, Or Result Does The Customer Or Sponsor Expect From The Project?”, Or “How
Will The Scope Be Verified?”
Pts: 1 Dif: Difficulty: Moderate Ref: P.7
Obj: Lo: 1-2 Nat: Busprog: Technology Top: What Is A Project?
Key: Bloom's: Comprehension
9. In Order To Be Realistic, A Project Manager Should Always Set Discrete Goals Instead Of A
Range Of Objectives.
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper Testbankprofessor. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €19,56. Je zit daarna nergens aan vast.