100% tevredenheidsgarantie Direct beschikbaar na betaling Zowel online als in PDF Je zit nergens aan vast
Eerder door jou gezocht
Summary Unit 4 Assignment 1.docx IS 3110 Unit 4 Assignment 1 Risk Assessment Approaches As the network administrator a representative for U.S. Industries I have drafted a brief qualitative and quantitative synopsis detailing the risks involved with completi€5,43
In winkelwagen
Summary Unit 4 Assignment 1.docx IS 3110 Unit 4 Assignment 1 Risk Assessment Approaches As the network administrator a representative for U.S. Industries I have drafted a brief qualitative and quantitative synopsis detailing the risks involved with completi
35 keer bekeken 0 keer verkocht
Vak
University Of Phoenix UoP
Instelling
University Of Phoenix
Unit 4 Assignment IS 3110 Unit 4 Assignment 1 Risk Assessment Approaches As the network administrator a representative for U.S. Industries I have drafted a brief qualitative and quantitative synopsis detailing the risks involved with completing this project on time, one month early and two mo...
unit 4 assignment 1docx is 3110 unit 4 assignment 1 risk assessment approaches as the network administrator a representative for us industries i have drafted a brief qualitative and quantitati
Geschreven voor
University Of Phoenix
University Of Phoenix UoP
Alle documenten voor dit vak (3705)
Verkoper
Volgen
helperatsof1
Ontvangen beoordelingen
Voorbeeld van de inhoud
IS 3110
Unit 4
Assignment 1
Risk Assessment Approaches
As the network administrator a representative for U.S. Industries I have drafted a brief
qualitative and quantitative synopsis detailing the risks involved with completing this project on
time, one month early and two months behind schedule., both with and without the required
security measures.
1. Estimate the risk of bringing the project to completion:
I. On time: Little to no risk as the project would be developed and fully operational
within the specified time limit of the contract.
II. One month early: This would give us more time to test/debug and bring the
network into full production with more than enough time to fix any minor issues
that arise, if any.
III. Two months late: First and foremost, the risk is financial. This contract stands to
bring in $20 Million annually to U.S. Industries. On the low end, we stand to lose
4% (2% for each month late) of the contract fees. This could add up to a
significant amount. $20M – 4% = $19.2M this would be a realization of $800K
lost. On the other end of the scale, if we are not able to get the whole project up in
production, then we would risk losing the contract another bidder.
2. Estimate the risks of bring the project to completion:
I. On time, but not with the require security: Technically the project is complete,
but there is a security risk that may violate the contract since the company did not
provide the required services stated in the contract. This in itself, would be the
same as coming in behind schedule.
II. One month early with the require security requirement: No risk. The company
completed the project early with the required services indicated within the
contract.
III. Two months late, without the required security requirement: Depending on when
the company would be able to implement the security requirements is directly
correlated with the contract and its guidelines; the contract may be ultimately
awarded to a different bidder.
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper helperatsof1. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor €5,43. Je zit daarna nergens aan vast.
Anatomy and Physiology Test Banks|| By Openstax, Elizabeth CO, Patton, Cinnamon, MCkinley, Thomson.|| All Chapters Included|| Latest Editions