- Samenvattingen en Aantekeningen

Op zoek naar een samenvatting over ? Op deze pagina vind je 155 samenvattingen over .

Alle 155 resultaten

Sorteer op

Sample questions from all CSLB trade exams with 100% correct answers 2025
  • Sample questions from all CSLB trade exams with 100% correct answers 2025

  • Tentamen (uitwerkingen) • 29 pagina's • 2025
  • The lifting lines should be as vertical as possible - correct answer When using a crane to lift a 12,000-gallon tank out of the excavation, what is the preferable position of the rigging lines attached to the tank's lifting eyes? A. One lifting line should be horizontal B. The lifting lines should be as far apart as possibles C. The lifting lines should be as horizontal as possible D. The lifting lines should be as vertical as possible Material that contains more than 1% asbestos -...
  • brittton
    (0)
  • €14,11
  • + meer info
CSLB B LICENSE GENERAL CONTRACTOR EXAM STUDY GUIDE – EXPERT VERIFIED ACTUAL 300+ QUESTIONS & ANSWERS FOR GUARANTEED PASS | NEWEST UPDATE, .
  • CSLB B LICENSE GENERAL CONTRACTOR EXAM STUDY GUIDE – EXPERT VERIFIED ACTUAL 300+ QUESTIONS & ANSWERS FOR GUARANTEED PASS | NEWEST UPDATE, .

  • Tentamen (uitwerkingen) • 33 pagina's • 2025
  • CSLB B LICENSE GENERAL CONTRACTOR EXAM STUDY GUIDE – EXPERT VERIFIED ACTUAL 300+ QUESTIONS & ANSWERS FOR GUARANTEED PASS | NEWEST UPDATE, .CSLB B LICENSE GENERAL CONTRACTOR EXAM STUDY GUIDE – EXPERT VERIFIED ACTUAL 300+ QUESTIONS & ANSWERS FOR GUARANTEED PASS | NEWEST UPDATE, .
  • newsolutions
    (0)
  • €16,39
  • + meer info
CSLB CLASS B GENERAL CONTRACTOR'S LICENSE - BUILDING'S EXAM: CORE TRADES (PART 2) COMPLETE AND LATEST VERSION WITH VERIFIED SOLUTIONS
  • CSLB CLASS B GENERAL CONTRACTOR'S LICENSE - BUILDING'S EXAM: CORE TRADES (PART 2) COMPLETE AND LATEST VERSION WITH VERIFIED SOLUTIONS

  • Tentamen (uitwerkingen) • 25 pagina's • 2025
  • "18 inches - CORRECT ANSWER In order to protect a water heater from damage, what is the minimum height it should be from the floor of a garage?" "4 (According to the California Plumbing Code, the vertical piping between two consecutive inlet levels shall be considered a wet-vented section. Each wet-vented section shall be not less than one pipe size exceeding the required minimum waste pipe size of the upper fixture or shall be one pipe size exceeding the required minimum pipe siz...
  • ExcelHub
    (0)
  • €17,75
  • + meer info
CSLB CONTRACTOR'S LAW & BUSINESS EXAM 200 QUESTIONS AND ANSWERS 100% VERIFIED ALREADY GRADED A+ NEWEST VERSION
  • CSLB CONTRACTOR'S LAW & BUSINESS EXAM 200 QUESTIONS AND ANSWERS 100% VERIFIED ALREADY GRADED A+ NEWEST VERSION

  • Tentamen (uitwerkingen) • 28 pagina's • 2025
  • "Every employer of ______ or more full or part time employees must keep written health and safety records for _______ years. A. 1-3 B. 7-4 C. 10-3 D. 11-5 - CORRECT ANSWER=> Every employer of 11 or more full or part time employees must keep written health and safety records for 5 years." "After you have read the plans and specifications, what is the next important step in writing a bid? A. Talk to and select subs. B. Walk the job. C. Call about materials, price, and ava...
  • ExcelHub
    (0)
  • €18,67
  • + meer info
CSLB CLASS B GENERAL CONTRACTOR'S LICENSE BUILDING'S EXAM QUESTIONS WITH DETAILED VERIFIED ANSWERS ALREADY GRADED A+ LATEST VERSION
  • CSLB CLASS B GENERAL CONTRACTOR'S LICENSE BUILDING'S EXAM QUESTIONS WITH DETAILED VERIFIED ANSWERS ALREADY GRADED A+ LATEST VERSION

  • Tentamen (uitwerkingen) • 18 pagina's • 2025
  • "What is the first thing you do for the side of a shear wall? A) Paint with latex paint B) Install wire mesh C) Seal the wall with primer D) Install No. 15 building felt A water-resistant barrier must be provided over the frame or sheathing of a shear wall. These barriers can be housewrap, Grade D Kraft building paper, or No. 15 building felt." “If you have a residential window schedule, how do you allow for the clearance between the framing and window? A) Obtain the exact m...
  • ExcelHub
    (0)
  • €16,84
  • + meer info
CSLB Class B General Contractor's License - Building's Exam: General Building Updates QUESTIONS AND VERIFIED CORRECT ANSWERS 2025
  • CSLB Class B General Contractor's License - Building's Exam: General Building Updates QUESTIONS AND VERIFIED CORRECT ANSWERS 2025

  • Tentamen (uitwerkingen) • 24 pagina's • 2025
  • B) 6 on edge 12 on center correct answer What fastener spacing is required for the corners of oriented strand board (OSB)? A) 6 on edge or 8 on center B) 6 on edge 12 on center C) 8 on edge 12 on center D) 8 on edge 16 on center B) Yes, with a pattern match correct answer Can linoleum be repaired or patched? A) Never B) Yes, with a pattern match C) Yes, just cut small patch to fit D) No, because it's not repairable correct answer What is the best tool used to cut a 2 ...
  • brittton
    (0)
  • €13,66
  • + meer info
CSLB B LICENSE GENERAL CONTRACTOR EXAM questions and 100% CORRECT ANSWERS 2025
  • CSLB B LICENSE GENERAL CONTRACTOR EXAM questions and 100% CORRECT ANSWERS 2025

  • Tentamen (uitwerkingen) • 43 pagina's • 2025
  • If unused mortar stiffens due to hydration of cement, what must you do? correct answer Discard the mortar What minimum time must you wait before caulking or grouting new tiles? correct answer 24-48 Hours How long should you wait before installing tile on a shower pan? correct answer 24 Hours Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: correct answer Ty...
  • brittton
    (0)
  • €13,66
  • + meer info
CSLB B LICENSE GENERAL CONTRACTOR EXAM QUESTIONS WITH VERIFIED ANSWERS 100% CORRECT ALREADY GRADED A+ LATEST AND COMPLETE VERSION
  • CSLB B LICENSE GENERAL CONTRACTOR EXAM QUESTIONS WITH VERIFIED ANSWERS 100% CORRECT ALREADY GRADED A+ LATEST AND COMPLETE VERSION

  • Tentamen (uitwerkingen) • 37 pagina's • 2025
  • "Triple-walled metal chimney installations are regulated by: - CORRECT ANSWER=> ICC ICC-IBC-IRC is the international code council. IBC is international building code commercial. IRC is the international residential code." "If you are a general contractor, you should call a specialty contractor when: - CORRECT ANSWER=> You encounter an unfamiliar trade." "When a stairway serves a public building, what is the minimum number of steps for which a handrail is required? -...
  • ExcelHub
    (0)
  • €19,58
  • + meer info
CSLB B LICENSE GENERAL  CONTRACTOR EXAM WITH ACTUAL  ANSWERS
  • CSLB B LICENSE GENERAL CONTRACTOR EXAM WITH ACTUAL ANSWERS

  • Tentamen (uitwerkingen) • 59 pagina's • 2025
  • CSLB B LICENSE GENERAL CONTRACTOR EXAM WITH ACTUAL ANSWERS The function of a Waler is? ️️A Waler is a horizontal member used to align and brace concrete forms or piles. If the width of a door that swings TOWARDS a landing on a ramp is 36", what minimum length landing is required? ️️A 78" landing is required for a 36" door that swings TOWARDS a landing. What are "as built" plants? ️️As built plans are plans showing all changes and repairs.
  • BrainSpark
    (0)
  • €14,93
  • + meer info
CSLB CONCRETE C8 LICENSE PRACTICE TEST 2 NEWEST 2025 EXAM QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!
  • CSLB CONCRETE C8 LICENSE PRACTICE TEST 2 NEWEST 2025 EXAM QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!

  • Tentamen (uitwerkingen) • 12 pagina's • 2025
  • CSLB CONCRETE C8 LICENSE PRACTICE TEST 2 NEWEST 2025 EXAM QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW! The maximum size of the conduit or pipe shall NOT exceed _______ of the thickness of the concrete. - Correct Answer 1/3" "Which of the following tests for concrete is conducted at the site/field? - Correct Answer Color Test Explanation: Rest of the above are laboratory tests." "Which of the following factor influence the posi...
  • Smith01
    (0)
  • €10,56
  • + meer info