logo-home

NinjaNerd

Here You will All Documents and Package Deals Offered by Seller NinjaNerd.

Community

  • Volgers
  • Volgend

1329 items

PJM Transmission Study Guide Exam Questions and Answers 100% Solved

(0)
€12,76
0x  verkocht

PJM Transmission Study Guide Exam Questions and Answers 100% Solved During System Restoration, what is the optimal Frequency Range? - 59.75 - 61 Hz The 500 kV system has normal bus voltages between? - 500 to 550 kV When Connecting 2 islands, the operator must match? - Voltage, Phase Angle and Frequency What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) - 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV When will PJM issue a Min...

i x
  •  Voordeelbundel
  • Tentamen (uitwerkingen)
  •  • 41 pagina's • 
  • door NinjaNerd • 
  • geupload  02-11-2024
Snel bekijken
i x

PJM Markets Certification Exam (Market Optimization Workshop PPs) Q&A 100% Pass

(0)
€12,27
0x  verkocht

PJM Markets Certification Exam (Market Optimization Workshop PPs) Q&A 100% Pass Residual Zone: - An aggregate containing all load buses in the fully metered EDC territory, minus all load that has been designated to be priced at a specific non-zonal (or nodal) location How are Residual Metered Load aggregate prices determined? - By weighting each load bus LMP by that bus's residual metered load aggregate distribution factor True or False? Security constrained economic dispatch minimiz...

i x
  •  Voordeelbundel
  • Tentamen (uitwerkingen)
  •  • 28 pagina's • 
  • door NinjaNerd • 
  • geupload  02-11-2024
Snel bekijken
i x

PJM GO Exam Questions and Answers 100% Solved | Guaranteed Success

(0)
€12,27
0x  verkocht

PJM GO Exam Questions and Answers 100% Solved | Guaranteed Success What is operating reserve? - is generation or load that can be deployed or removed within 30 minutes of the request What is synchronous reserve? - is generation or load that can be deployed or removed removed within 10 minutes of the request, and must be electrically synchronized What are non-synchronous (quick start) reserves? - is generation or load that can be deployed or removed within 10 minutes of the request, and ...

i x
  •  Voordeelbundel
  • Tentamen (uitwerkingen)
  •  • 23 pagina's • 
  • door NinjaNerd • 
  • geupload  02-11-2024
Snel bekijken
i x

PJM Final Exam Questions and Answers 100% Solved | Latest Update

(0)
€11,28
0x  verkocht

PJM Final Exam Questions and Answers 100% Solved | Latest Update Portfolio management. - You are a manager at Chenco LTD. Your job responsibility is to align components (projects, programs, or related operations) to the organizational strategy, organized into portfolios or subsidiary portfolios to optimize project or program objectives, dependencies, costs, timelines, benefits, resources, and risks. This is known as: A temporary endeavor undertaken to create a unique product, service, or...

i x
  •  Voordeelbundel
  • Tentamen (uitwerkingen)
  •  • 22 pagina's • 
  • door NinjaNerd • 
  • geupload  02-11-2024
Snel bekijken
i x

PJM Exam Questions and Verified Answers 100% Guaranteed Pass

(0)
€11,28
0x  verkocht

PJM Exam Questions and Verified Answers 100% Guaranteed Pass True or False? Jetstream is a data system used to connect remote assets and PJM to satisfy real-time market and other data transactions. - True What is the software tool that is designed to enable the PJM dispatchers to manage generating unit and transmission constraint information and administer the Real-Time Regulation Market? - Dispatch Management Tool (DMT) What is the system that solves a backup Area Control Error calcula...

i x
  •  Voordeelbundel
  • Tentamen (uitwerkingen)
  •  • 64 pagina's • 
  • door NinjaNerd • 
  • geupload  02-11-2024
Snel bekijken
i x

PJM Exam Questions and Answers 100% Solved | Graded A+

(0)
€11,28
0x  verkocht

PJM Exam Questions and Answers 100% Solved | Graded A+ What is the threshold for having a satellite phone? - 500 MW How often is reactive testing completed? - 5 years Which of the following would NOT be a cause for a sudden deviation in the balancing area ACE? 1) Incorrect interchange number 2) Loss of a tie-line RTU 3) Loss of internal load 4) Loss of adjacent control area generation - Loss of adjacent control area generation PJM should be made aware of any fuel shortage that a gener...

i x
  •  Voordeelbundel
  • Tentamen (uitwerkingen)
  •  • 19 pagina's • 
  • door NinjaNerd • 
  • geupload  02-11-2024
Snel bekijken
i x

PJM Exam Questions and Answers 100% Solved | Graded A+

(0)
€11,28
0x  verkocht

PJM Exam Questions and Answers 100% Solved | Graded A+ Leading phase when current is ... - Capacitive What is the minimum passing score for a unit regulation test? - 75% compliance with the test signal What generation is available within 10 minutes for offline reserves? - Quick-start How does PJM avoid dealing with economic issues during transmission related constraints? - Cost (offer) capping generation Which balancing control mode is used by PJM under normal operations? - Tie-line bi...

i x
  •  Voordeelbundel
  • Tentamen (uitwerkingen)
  •  • 47 pagina's • 
  • door NinjaNerd • 
  • geupload  01-11-2024
Snel bekijken
i x

PJM 5900 Practice Exam Questions and Answers 100% Solved | Rated A+

(0)
€8,83
0x  verkocht

PJM 5900 Practice Exam Questions and Answers 100% Solved | Rated A+ A matrix project that closely resembles a pure project is referred to a - strong matrix A precedence relationship where the completion of a successor activity depends on the completion of a predecessor activity is called a - finish to finish A professional organization for project management specialists is the - PMI. A project charter affirms that all major parties of interest are in agreement on - all the above A pro...

i x
  •  Voordeelbundel
  • Tentamen (uitwerkingen)
  •  • 7 pagina's • 
  • door NinjaNerd • 
  • geupload  01-11-2024
Snel bekijken
i x

PJM 5900 Final Exam Questions and Answers 100% Solved | Latest Update

(0)
€12,27
0x  verkocht

PJM 5900 Final Exam Questions and Answers 100% Solved | Latest Update All of the following are true about projects and operations, EXCEPT: - Because of their temporary nature, projects cannot help achieve an organization's long-term goals. Therefore, strategic activities in the organization can be generally addressed within the organization's normal operations. Which of the following statements best describe a project? - A temporary endeavor undertaken to create a unique product, s...

i x
  •  Voordeelbundel
  • Tentamen (uitwerkingen)
  •  • 15 pagina's • 
  • door NinjaNerd • 
  • geupload  01-11-2024
Snel bekijken
i x

PHMD Q6 Final Exam #random Questions and Answers 100% Pass

(0)
€12,27
0x  verkocht

PHMD Q6 Final Exam #random Questions and Answers 100% Pass Flat foot (over pronation) Valgus stress at knee Medial tibia Medial (internal rotation) of femur - When would an external rotation correction of an internally rotated femur be indicated? Diminished pronation Varus stress at the knee Lateral tibia Lateral (external rotation) of femur - When would an internal rotation correction of an externally rotated femur be indicated? Low back pain, Chronic female and male genitourinary ...

i x
  •  Voordeelbundel
  • Tentamen (uitwerkingen)
  •  • 23 pagina's • 
  • door NinjaNerd • 
  • geupload  01-11-2024
Snel bekijken
i x