100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
North American Electric Reliability Corporation (NERC) Tests Bundle Set R817,71   Add to cart

Package deal

North American Electric Reliability Corporation (NERC) Tests Bundle Set

North American Electric Reliability Corporation (NERC) Tests Bundle Set

30 items

KNOWN NERC EXAM QUESTIONS with correct answers

(0)
R269,35

A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? a) Loss of a large generator in the area b) An inaccurate load forecast c) Loss of a major transmission line d) A malfunction of EMS CORRECT ANSWER b) An inaccurate lo...

View example

Practice Test NERC Questions with correct answers

(0)
R287,94

A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? CORRECT ANSWER The phase angle will increase. When load is increased phase...

View example

Nerc Test questions with correct answers

(0)
R278,64

According to Nerc Standards, an emergency interchange transaction can be exempt from tagging if it is less than_________________ CORRECT ANSWER 60 minutes A BA or LSE that requests an EEA 3 must complete and EEA 3 report and submit it to the RC within how many days CORRECT ANSWER 2 business days ...

View example

SOS NERC Prep - Reliability Exam questions with correct answers

(0)
R278,64

The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? A) Increase Net Interchange Sched...

View example

NERC RC Exam questions with correct answers

(0)
R250,76

Common standard time period for station battery to handle outage of AC power to chargers CORRECT ANSWER 8-12 hours Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed unsuccessful CORRECT ANSWER 2 hours Transition period to backup control facility (fully functi...

View example

NERC text questions with correct answers

(0)
R297,23

Operating reserve may be provided by which of the following? A. LTCs B. Capacitor banks C. Voltage regulators D. Interruptible loads CORRECT ANSWER D. Interruptible loads Which of the following is the responsibility of a reserve sharing group (RSG)? A. Complying with DCS as if it was a singl...

View example

NERC Certification Exam questions with correct answers

(0)
R260,05

True/False According to the NERC Functional Model, there is no difference between the function and the entity. A) True B) False CORRECT ANSWER B) False True/False Analysis type questions are designed to be the least complex from a human cognitive process. A) True B) False CORRECT AN...

View example

NERC Reliability Standards study guide

(0)
R260,05

BAL-001-0.1a CORRECT ANSWER Real Power Balancing Control Performance BAL-STD-002-0 CORRECT ANSWER Operating Reserves (WECC) BAL-003-0.1b CORRECT ANSWER Frequency Response and Bias BAL-004-0 CORRECT ANSWER Time Error Correction BAL-004-WECC-01 CORRECT ANSWER Automatic Time Error Correctio...

View example

Practice questions for the NERC exam with correct answers

(0)
R260,05

b. NERC Operating Committee CORRECT ANSWER What group can approve a change in the Disturbance Recovery Period for an Interconnection? a. NERC Interconnection Working Group b. NERC Operating Committee c. NERC Regional Council d. NERC Disturbance Analysis Working Group c. Check targets and ...

View example

NERC questions with correct answers

(0)
R287,94

BAL Requirement for reviewing MSSC CORRECT ANSWER annually BAL default recovery period for recovery from MSSC CORRECT ANSWER 15 min BAL 2 methods of complying with DCS CORRECT ANSWER RSG ACE BA ACE BAL Contingency reserve restoration period is how long? CORRECT ANSWER 90 min BAL Whe...

View example

NERC Test Questions with correct answers

(0)
R297,23

What percentage of load gives a 1 Hz change in an island condition? CORRECT ANSWER 6-10% (Think 6-10 day island vacation) If ACE is Zero but system Hz is off, what should a system operator do? CORRECT ANSWER Nothing! ACE bias and interchange schedule will improve frequency If ACE is Zero, why ...

View example

NERC PREP TEST 101 questions with correct answers

(0)
R287,94

1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All a...

View example

NERC RC questions with correct answers

(0)
R250,76

System studies identify what CORRECT ANSWER Predict operations and identify constraints If ACE remains the same and frequency goes up what has happened? CORRECT ANSWER Someone lost load When a generator has its AVR in service it is a? CORRECT ANSWER Dynamic source of reactive power Black st...

View example

NERC Terms

(0)
R269,35

Adjacent Balancing Authority CORRECT ANSWER A Balancing Authority whose Balancing Authority Area is interconnected with another Balancing Authority Area either directly or via a multi-party agreement or transmission tariff. After the Fact CORRECT ANSWER A time classification assigned to an RFI wh...

View example

NERC question SOS questions with correct answers

(0)
R287,94

As a Transmission Operator, you realize that the voltage level is starting to decline in the North West part of the system. Which of the following devices should you, as a Transmission Operator, be able to operate, and/or have another entity operate to raise the voltage level back to normal in the N...

View example

My NERC questions with correct answers

(0)
R306,52

A misoperation occurred when an overhead ground wire on a 230KV transmission line between two substations broke and fell across A phase of the line. One of the line circuit breakers failed to open causing the breaker failure relay to pick up and as a result tripped the entire substation bus off line...

View example

NERC question questions with correct answers

(0)
R306,52

Two phase conductors of a 138kV transmission line come in contact due to a storm, creating a phase to phase fault. The distance relay at each end of the line tripped and isolated the line. What two measured parameters of the line caused the distance relay to operate? Temperature and length MWs ...

View example

NERC questions with correct answers

(0)
R287,94

In order for a generator to qualify as regulating reserve it must have which of the following characteristics ? Generator must be ronized , and its governor blocked Generator must be off - line and available in 10 minutes Generator must be synchronized , and its governor not blocked ...

View example

NERC SOS questions with correct answers

(0)
R278,64

If a Balancing Authority does not comply with the Control Performance Standard, the Balancing Authority is not permitted to provide which of the following for any other Balancing Authority entities? CORRECT ANSWER Regulation of other services related to control performance 1. It is the obligation...

View example

NERC RC BAL-001 questions with correct answers

(0)
R260,05

System Frequency Rule of Thumb CORRECT ANSWER 1% change in frequency leads to 2% change in MW load Each BA shall operate resources to provide for a level of operating reserve sufficient to account for? CORRECT ANSWER Frequency Support Errors in load forecasting generation loss transmission una...

View example

NERC ~ RC (NP3 Transmission) questions with correct answers

(0)
R278,64

Q32618 When a high voltage transmission line circuit breaker trips open as a result of a fault, a synchronous check relay will monitor certain values on both the line side and the bus side of the open circuit breaker. Before the synchronous check relay re-closes the open circuit breaker, which of th...

View example

NERC RC IRO-001 to IRO-006 questions with correct answers

(0)
R260,05

What is the purpose of IRO-002? CORRECT ANSWER RCs must have the authority, plan & agreements in place to immediately direct reliability entities within their areas to redispatch generation, reconfigure transmission or reduce load to mitigate critical conditions to return the system to a reliable st...

View example

NERC questions with correct answers

(0)
R269,35

What entity balances generation and monitors/employs contingency reserves? CORRECT ANSWER Balancing Authority (BA) What entity has the widest system view and is the "supervisor"? CORRECT ANSWER Reliability coordinator (RC) What entity monitors transmission lines and operates tap-changers, br...

View example

NERC cheat sheet questions with correct answers

(0)
R194,99

3 phase power equation CORRECT ANSWER √3 x V x I x Power factor Total power equation CORRECT ANSWER S = √3 x V x I Generator rpm equation CORRECT ANSWER N = 120xF/P Droop Equation CORRECT ANSWER Generator Capacity/Droop setting = Response/Change in frequency (Hz) 1% drop in what is 2...

View example

NERC Practice Set 3 questions with correct answers

(0)
R260,05

b. Perform power flow study in preparation of opening Line 1 CORRECT ANSWER Your system is experiencing heavy loading and low voltage . What is the first response for a System Operator ? a) Take lines out of service b) Put capacitors in service c) Put reactors in service d) Lower loads COR...

View example

NERC Test Questions with correct answers

(0)
R269,35

What percentage of load gives a 1 Hz change in an island condition? CORRECT ANSWER 6-10% (Think 6-10 day island vacation) If ACE is Zero but system Hz is off, what should a system operator do? CORRECT ANSWER Nothing! ACE bias and interchange schedule will improve frequency If ACE is Zero, why ...

View example

NERC RC BAL-005 questions with correct answers

(0)
R250,76

NERC RC BAL-005 questions with correct answers

View example

NERC SOS Pre-Assessment questions with correct answers

(0)
R250,76

What are three primary AGC control models? CORRECT ANSWER-Tie-Line Bias, Constant Frequency, Constant Net Interchange When a balancing Authority's ACE is zero, what is true? CORRECT ANSWER-The BA load-interchange-generation balancing while supporting Interconnection Frequency In a 3-phase AC ...

View example

SOS: NERC Terms and Definitions

(0)
R269,35

Area Control Error (ACE) CORRECT ANSWER-The instantaneous difference between a Balancing Authority's net actual and scheduled interchange, taking into account the effects of Frequency Bias, correction for meter error, and Automatic Time Error Correction (ATEC), if operating in the ATEC mode. ATEC i...

View example

SOS Interconnection Reliability Operations and Coordination Test questions with correct answers

(0)
R250,76

c. authority CORRECT ANSWER-1. A Reliability Coordinator must have the _________ to immediately direct reliable entities within their Reliability Coordinator Areas to re-dispatch generation, reconfigure transmission, or reduce load to mitigate critical conditions to return the system to a reliable s...

View example
Show all
avatar-seller

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through EFT, credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying this summary from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller cracker. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy this summary for R817,71. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75759 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy summaries for 14 years now

Start selling
R8.117,59 R817,71
  • (0)
  Buy now